Laserfiche WebLink
• *..e BORING Y- PBS—N3/MW-3 <br /> E <br /> Z z g n DRILLING REMARKS 0C FIELD GEOLOGIST Rob Dda <br /> naro DATE BEGAN 7/18/03 <br /> n ar CHECKED BY R Odnowo DATE FINISHED 7/18/03 <br /> of <br /> o_ a <br /> w N a. TndBr: Rotel Baa APPROVED BY 0- mow• SURFACE ELEV.50.0 R and <br /> I.e TOTAL DEPTH 23 R CORE SRE e' dla. <br /> DESCRIPTION0 <br /> �.... 4 ASPHALT un4e by engineered M <br /> Locking Cap fib <br /> Vy� ; 2 <br /> .� -; 3/ar 3/aPEA GRAVEL to matwid. <br /> 2' Dia. flw <br /> PrC Geeing <br /> fill <br /> 1+1 Med GMP •.. <br /> 5 NR NA NR BentonTa •-?' <br /> sew <br /> 6. <br /> CLAY IN SILT. Do* reddish brom. <br /> oist <br /> Kine sand. 70-808 cloy, 20-305 alt medium plostic t% <br /> Ir <br /> d <br /> La <br /> 10 - 10. <br /> 3 4/5/8 1005 — Y_Fleet encountered greandwatsr at 10.5 it <br /> (107 ' LEAN CLAY 1NTH SAND: wl <br /> Light bra ..wet, medium denaKA 20-305 the <br /> zDI.. PNC <br /> y screen VC sand. 10-205 M0R t, 50-6day Interbedded up to r of SAPID (me <br /> .020 inch ebb — gra) with day enc twed <br /> y <br /> 15 __ Beaomn mare SANDY of SAID tine to medium grained, wet <br /> PS-3 /6/11 755 Saed 03 <br /> frr cl <br /> 8' Db. <br /> Borehole — <br /> L _ <br /> 20 Len SAND with depth. <br /> 3 /4/1 <br /> (20) — <br /> Bottom — <br /> b. Cap <br /> TOTAL DEPTH OF BORING 23 FEET <br /> y <br /> 5LA -25- <br /> LA <br /> 1.+ <br /> 30 <br /> I <br /> 35 <br /> DRILLER Fousto Santos PAGE 1 OF <br /> DRILLING CO. : Gregg Drilling <br /> DRILLING METHOD 8" HSA <br /> SAMPLING METHOD <br /> PROJECT : SBC <br /> L. LOCA71ON : Tracy, CA ! ` <br /> PROJECT NO. : 838819.79000000 <br /> SEEM- <br /> L. <br /> BY RB l7fECA(m OT •24 X73 DRAWINGG N0. :838818-A1s6 Shaw E& Inc. <br /> y DATE 1_29/05/03 I APPROVED BY <br />