Laserfiche WebLink
N <br /> N <br /> EAST 12th STREET <br /> CD <br /> Ir- ' <br /> SOIL/LANDSCAPING <br /> i <br /> WROUGHT-IRON411 FENCE <br /> I�. \•� i <br /> i SOIL LANDSCAPING •`•� <br /> ♦ <br /> MW-1 PB-GW-6 CINDER-BLOCK j •\'� <br /> TPH-D 1 77 GA WALL \ <br /> Mw-2 — 07/03 <br /> Mw-1 — 07 03 TPH—D I ND I <br /> TPH—D I N4 IMW-2 — 10/03 Mw-2" •� <br /> MW-1 — 16 03 TPH-D I >ESTIMATED EXTENT OF <br /> TPH-D I ND IMPACTED •\ <br /> PB—GW-5 ;-"~ GROUNDWATER � <br /> 50 i RESIDENTIAL SOIL/LANDSCAPING <br /> FORMER BUILDING •� <br /> PB-GW-2 ' 2,000-GALLON \ <br /> TPH-D ND DIESEL UST � <br /> (REMOVED CINDER- <br /> BLOCK <br /> PB—GW-403/13/02) GARBAGE ENCLOSU E +\ <br /> TPH—D I ND I I •\ <br /> PB—GW-1 _ <br /> W-1 I •\ <br /> la l <br /> j W 7 � <br /> o � <br /> VW— <br /> H � <br /> 3 •\ <br /> $ J SBC PB-Gw-3 I SHED <br /> o BUILDING TPH—D iso I 1 <br /> ESTIMATED EXTENT OF <br /> IMPACTED W-3 — 07/03 <br /> GROUNDWATER ___ TpH-D ND ASPHALT-PAVED EXISTING <br /> Mw-3 - 10/03 DRIVEWAY 8,000-GALLON <br /> rTVH---pT ND I DIESEL UST <br /> APPROXIMATE <br /> LIMITS OF <br /> EXCAVATION <br /> i <br /> { <br /> FORMER 500-GALLON W� <br />' HEATING OIL UST <br /> NEW ADDITION (REMOVED 02/19/02) cn <br /> TO BUILDING a <br />' APPROXIMATE � <br /> LIMITS OF <br /> ` <br /> EXCAVATION O IL <br /> J <br />' NOTE SAMPLES RUN FOR ADDITIONAL PETROLEUM HYROCARBON ANALYTES, <br /> �FGENQ NO ANALYTES WERE DETECTED <br /> SBC FACILITY <br />' 10 EAST 12th STREET <br /> INFERRED EXTENT OF DETECTABLE TPH-D IN TPH-D - TOTAL PETROLEUM HYDROCARBONS AS DIESEL TRACY, CAUFORNIA <br /> O GROUNDWATER Shaw E&I,hr. <br /> ND - NOT DETECTED <br />' TANK EXCAVATION SAMPLE LOCATION (MARCH 2002) ALL RESULTS REPORTED IN PARTS PER BILLION APPROXIMATE SCALE FIGURE 9 <br /> SOIL BORING SAMPLE LOCATION (SEPTEMBER 2002) 1 1 ESTIMATED EXTENT OF PETROLEUM <br /> ® MONITORING WELL SAMPLE LOCATION (JULY AND 0 20 0 FEET HYDROCARBONS IN GROUNDWATER <br />' OCTOBER 2003) <br />