My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009363
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2900 - Site Mitigation Program
>
PR0518209
>
ARCHIVED REPORTS_XR0009363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:38:33 PM
Creation date
5/8/2020 2:33:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009363
RECORD_ID
PR0518209
PE
2950
FACILITY_ID
FA0013759
FACILITY_NAME
PACIFIC BELL
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
02
SITE_LOCATION
10 E 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5-1 <br /> Activity Level of Protection <br /> Task Activity Initial Levels of PPE <br /> 1 Mobilization/Demobilization Level D <br /> 2 Utility Survey Level D* <br /> 3 Hydropunch opertion Level D <br /> 4 Soil sampling Mod Level D <br /> 5 Water sampling Mod Level D <br /> 6 Decontammabon of Equipment Level D Mod <br /> 7 Backfillinglgroubrig Level D <br /> As site actnnttes progress,levels of PPF are subject to change or to modification Upgrading ofPPE can occur when action levels are <br /> exceeded or whenever the need arises to protect the safety and health of site personnel Levels of PPE will not be downgraded without <br /> pnor approval from the Program CIH <br /> Table 8-1 <br /> Action Levels to be Observed for Selection of PPE During Site Operations <br /> • Analyte Action Level' I Required Actton2 <br /> When in Level D PPE <br /> Dust i 2 0 mglm3(sustained) Upgrade to Level C <br /> Unknown VOC >5 ppm above background Detector tube for benzene,continue work if no benzene detected <br /> Benzene < 1 ppm s 5 ppm Upgrade to Level C <br /> >5 ppm Stop work,contact CIH3 <br /> 02 z 23 5%ors 20% Stop work,determine cause3 <br />' LEL z 10%of LEL Stop work,determine cause3 <br /> I Fiveexcursions above the action level in any 15 minute period or a sustained reading in excess of the action levels for 5 minutes will <br /> tngger a response <br /> 2 Frequency of airmonitonng may be adjusted by the CIH atter sufficient charactenzatron of site contaminants has been completed, <br /> tasks have been modified,or site controls have proven effective <br /> 3 Contact with the Program CfH must be made pnor to continuance of work The Program CIH may then ingiate integrated air <br /> sampling along with additional engineering controls <br /> BZ denotes breathing zone Levels of PPE shall not be downgraded without authonzation from the Program CIN <br /> 7 <br /> 1 C W bnlwllcmimerckAP.B.Hp.cbe&s,Y r"tLSHSP doc <br /> 712302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.