My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
13436
>
2900 - Site Mitigation Program
>
PR0528271
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:59:11 PM
Creation date
5/8/2020 2:46:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528271
PE
2950
FACILITY_ID
FA0019110
FACILITY_NAME
LIMA RANCH
STREET_NUMBER
13436
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513001
CURRENT_STATUS
01
SITE_LOCATION
13436 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M • <br /> w, , <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> The following sediment regimes have been identified: <br /> 1. Wastewater Treatment Pond <br /> 2. Holding Pond <br /> 3. Drainage Ditches <br /> 4. Reference Sites—Pixie Slough <br /> 5. Reference Sites—Up-gradient Farm Pond <br /> For most regimes, sample locations and numbers of samples will be based determined based <br /> on hydrologic features, potential sediment inputs, access constraints, and deposition <br /> conditions. <br /> 2.5 Task 5—Site Investigation Report <br /> A report summarizing the results of the Site Characterization activities associated with this <br /> Work Plan will be prepared. The report will include tables, maps, figures,boring logs, <br /> geologic cross-sections, and appendices summarizing the data collected during the field <br /> activities. The report will include: <br /> 1. A delineation of the groundwater impacts beneath operational areas at the Site <br /> and off-site; and <br /> 2. An assessment of impacts related to point and non-point source discharges. <br /> 3.0 FIELD ACTIVITIES <br /> This section contains the procedures that will be used to collect the groundwater, surface <br /> water, and sediment samples and collect information on soil lithology. <br /> 3.1 Pre-Field Activities <br /> The following pre-field activities will be conducted prior to advancing the reconnaissance <br /> borings: <br /> 1. Obtaining access agreements from property owners for the proposed boring <br /> locations—the exact locations of the proposed boring locations will be based, <br /> in part, on field constraints,utility locations, and other subsurface obstructions; <br /> 2. Marking and clearing proposed boring locations of subsurface utilities and <br /> other obstructions using a subsurface locator company; <br /> Lima Ranch 6 of 17 <br /> Site Characterization Work Plan Addendum <br /> April 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.