Laserfiche WebLink
%no, *kmw <br /> L■ 3. Verification of results with an alternative method. For example, calcium may be <br /> determined by atomic absorption, ion chromatography, or titrimetric methods. Volatile <br /> organics may be determined through either purge and trap or liquid-liquid extraction <br /> methods. <br /> 4. Inclusion of a trip blank, (consisting of deionized or distilled water in a sample bottle that <br /> is prepared in a manner identical to the preparation of all other sample bottles for that <br /> 4.2 analytical technique) in each shipment of sample bottles to a sampling location. <br /> 4 Miscellaneous Checks of Accuracy <br /> 6" To insure that proper sampling procedures are followed in the field, one field blank will be collected <br /> for every ten ground water samples collected in the field. Procedures for collection of the field <br /> 6.2 blank will be identical to these for collection of the ground water samples, with the exception that <br /> deionized (or distilled) water will be poured into a laboratory-cleaned, teflon bailer and then <br /> discharged from the bailer to the appropriate sample bottle(s). <br /> 2.5 Miscellaneous,Checks of Accuracy <br /> Where trace analysis is involved, purity of the solvents, reagents, and gases employed is of great <br /> concern. The laboratory maintains a service contract on all major instrumentation:gas chromatogra- <br /> phs, atomic absorption, ion chromatography, and total organic carbon analyzers are all serviced and <br /> maintained regularly. <br /> The above program is more than sufficient for most needs. Additional quality assurance, such as <br /> spikes and duplicates on all analyses, will be provided if requested. <br /> 4.0 SITE SAFETY PLAN <br /> �. This plan addresses safety provisions to be employed during the site investigative filed work in the <br /> vicinity of 3725 Tracy Boulevard, Tracy, California. The objective of the plan is to describe <br /> procedures and actions to protect the worker, as well as uninvolved parties, from inhalation and <br /> ingestion of, and direct skin contact with, potentially hazardous materials that may be encountered <br /> at the site. The plan describes personnel responsibilities, protective equipment to be worn as <br /> +i appropriate when working on the site, and the locations and phone numbers of emergency facilities. <br /> 4.1 Personnel Responsibilities <br /> Key personnel directly involved in the investigation who will be responsible for monitoring the <br /> execution of safe work practices and the provisions of this plan are the drilling subcontractor project <br /> supervisor and the Delta project field manager. These personnel are responsible for knowing the <br /> provisions of the plan, communicating plan requirements to workers under their supervision and to <br /> site visitors, and for enforcing the plan. <br /> LA <br />