My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2900 - Site Mitigation Program
>
PR0528359
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:20:07 PM
Creation date
5/8/2020 2:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0528359
PE
2950
FACILITY_ID
FA0019146
FACILITY_NAME
SHELL OIL PRODUCTS US
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21217030
CURRENT_STATUS
02
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> likely to be encountered within the uppermost saturated zone at the site. Available geologic <br /> information will be utilized in the selection of this grain size. The gravel pack will be selected such <br /> that it will permit the development of a zone of higher hydraulic conductivity adjacent to the well <br /> screen but will not allow piping of the finer-grained formation into the well bore. The slot size of <br /> the well screen will be selected such that it will retain a minimum of 95 percent of the gravel pack <br /> material. <br /> 1.5 Monitoring Well Development <br /> If monitoring wells are installed, each monitoring well will be developed after construction with a <br /> 1.75-inch--diameter manual pump until the water produced is relatively sediment free or until <br /> measurements of pH, specific conductance, and temperature stabilize. If the well is pumped dry <br /> during the development process, recharged rates will be recorded. No water or chemicals will be <br /> in into the monitoring wells during well development. All developed water will be placed <br /> n drums on site for later disposal. <br /> 1.6—Ground Water„Sampling <br /> A minimum of 24 hours following well development, and after water levels have been allowed to <br /> stabilize in the well, three to five wetted casing volumes of liquid will be removed from each well <br /> by bailing with a laboratory-cleaned teflon bailer. Measurements of pH, specific conductance, and <br /> temperature will be made at regular intervals during this procedure. Removal of liquid from each <br /> well will continue until the measurement pH,specific conductance,and temperature have stabilized. <br /> A liquid sample will then be collected from each well with a laboratory-cleaned, dedicated teflon <br /> bailer. Each sample will be appropriately labeled and stored on ice from the time of collection <br /> through the time of delivery to the laboratory. Ground water samples will be transported to the <br /> laboratory and analyzed within the EPA-specified holding times for the requested analyses. <br /> 1.7 Petroleum Product <br /> If free petroleum product is present in a well, the thickness of the product layer will be measured <br /> by collecting a sample in a transparent teflon bailer with a check valve at the bottom or by <br /> measurement using appropriate fluid-level sounding equipment. The sample will be transferred to <br /> an appropriate sample container and subsequently submitted for fuel fingerprint analysis at the <br /> laboratory. <br /> 2.0 ANALYTICAL PROCEDURE <br /> All soil samples submitted to the laboratory will be analyzed by EPA Method 8020 for benzene, <br /> toluene, ethylbenzene, xylene(BTEX),and by U.S.Environmental Protection Agency(EPA)Method <br /> 8015 for total purgeable petroleum hydrocarbons(TPPH . All ground water samples submitted to the <br /> laboratory will be analyzed by EPA Method 602 for BTEX and by EFA Method 8015 for 'PP'. <br /> Total lead will be analyzed in soil and ground water samples by EPA Methods and <br />
The URL can be used to link to this page
Your browser does not support the video tag.