Laserfiche WebLink
4. Inclusion of a trip blank, (consisting of deionized or distilled water in a sample bottle that <br /> is prepared in a manner identical to the preparation of all other sample bottles for that <br /> analytical technique) in each shipment of sample bottles to a sampling location. <br /> 3.4.. Miscellaneo-u_s_Cbecks of Accuracx <br /> To insure that proper sampling procedures are followed in the field, one field blank will be collected <br /> for every ten ground water samples collected in the field. Procedures for collection of the field <br /> blank will be identical to these for collection of the ground water samples, with the exception that <br /> deionized (or distilled) water will be poured into a laboratory-cleaned, teflon bailer and then <br /> discharged from the bailer to the appropriate .sample bottle(s). <br /> 2.5 Miscellaneous Checks of,Accuracy- <br /> Where trace analysis is involved, purity of the solvents, reagents, and gases employed is of great <br /> concern. The laboratory maintains a service contract on all major instrumentation: gas <br /> chromatographs, atomic absorption, ion chromatography, and total organic carbon analyzers are all <br /> serviced and maintained regularly. <br /> The above program is more than sufficient for most needs. Additional quality assurance, such as <br /> spikes and duplicates on all analyses, will be provided if requested. <br /> 4.0SITE SAFETY PLAN <br /> This plan addresses safety provisions to be employed during the site investigative filed work in the <br /> vicinity of 3725 Tracy Boulevard, Tracy, California. The objective of the plan is to describe <br /> procedures and actions to protect the worker, as well as uninvolved parties, from inhalation and <br /> ingestion of, and direct skin contact with, potentially hazardous materials that may be encountered <br /> at the site. The plan describes personnel responsibilities and protective equipment to be worn as <br /> appropriate when working on the site. <br /> 4.1 Personnel Responsibilities <br /> Key personnel directly involved in the investigation who will be responsible for monitoring the <br /> execution of safe work practices and the provisions of this plan are the drilling subcontractor project <br /> supervisor and the Delta proiectJjgU mang= These personnel are responsible for knowing the <br /> provisions of the plan, communicating plan requirements to workers under their supervision and to <br /> site visitors, and for enforcing the plan. <br /> 4:2 Personnel Protection <br /> The designated personnel-protective equipment is selected to prevent filed personnel from exposure <br /> to gasoline fuel products that may be present at the site. To prevent direct skin contact, the following <br /> protective clothing will be worn as appropriate while working at the site: <br /> L <br />