g <br /> PREUMNARY REPORT AND TANK CLOSURO REPORT <br /> Tracy Boulevard Shell <br /> 3725 Tracy Boulevard,Tracy,California <br /> Delta Project No.40.89-012 <br /> Page 7 <br /> Three 4-inch-diameter monitoring wells(MW-1A,MW-2A,and MW-3A)were installed as replacements for <br /> the abandoned wells on August 16, 1990. Monitoring well locations are shown in Figure 2. The wells were <br /> constructed with Schedule 40 PVC riser pipe,0.020 slot-size screen,#3 Monterey sand filter pack,and sealed <br /> with bentonite pellets and Portland Type I cement grout with 5 percent bentonite. Monitoring well MW-IA <br /> was screened from 7 to 22 feet below the ground surface,MW-2A from 6.5 to 21.5 feet,and MW-3A from <br /> 7.5 to 22.5 feet. <br /> 3.4 Survey of Monitorin Wells <br /> On September 26, 1989, monitoring wells MW-1, MW-2, and MW-3 were surveyed to determine the <br /> elevations of the riser pipe and the adjacent ground surface with reference to a bench mark with an assumed <br /> elevation of 100.0 feet. The bench mark was located on top of the sidewalk at the northeast corner of the <br /> station building (see Figure 3). <br /> On August 28, 1990, monitoring wells MW-IA. MW-2A,and MW-3A were surveyed to determine the <br /> elevations of the riser pipe and the adjacent ground surface with reference to a bench mark with an assumed. <br /> r <br /> elevation of I00.0 feet. The bench mark was located on top of the fire hydrant located on the east side of <br /> Tracy Boulevard,directly east of the site. <br /> 3.5 Well Development <br /> Monitoring wells MW-I,MW-2,and MW-3 were developed on September 26,1989. Approximately seven <br /> well casing volumes of water were removed from each well. Monitoring wells MW-IA. MNV-2A, and <br /> MW-3A were developed on August 16, 1990. Fifty-five gallons of water were removed from MW-IA, 30 <br /> gallons from MW-2A,and 30 gallons from MW-3A. Water was stored on site in 55-gallon drums and later <br /> transported to Shell's refinery in Martinez,California. <br /> 3.6 Soil Chemistry <br /> A total of 42 soil samples were collected from soil borings SII-I through SB-4, SB-7 through SB-11,and <br /> monitoring wells MW-I through MW-3,and MW-IA through MW-3A. Each soil sample was screened for <br /> ------------ the presence of petroleum constituents using a portable photoionisation detector(PIIS)equipped with a-10.2--___ <br /> eV lamp calibrated for benzene for direct reading in parts per million. The PID indicated that no sample <br /> had a reading of greater than 10 ppm. One soil sample from each soil boring was submitted to a state- <br /> certified laboratory and analyzed for TPH and BTEX. The laboratory analytical results are presented in <br /> Table 5,and the laboratory reports are presented in Appendix E . <br />