My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8700
>
2900 - Site Mitigation Program
>
PR0536304
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:48:53 PM
Creation date
5/8/2020 3:28:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536304
PE
2950
FACILITY_ID
FA0020864
FACILITY_NAME
C & C AUTO REPAIR
STREET_NUMBER
8700
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242015
CURRENT_STATUS
01
SITE_LOCATION
8700 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Septic Dralnfield Investigation March 7,2013 <br /> 8700 Thornton Rd. Project No.1091 <br /> Stockton,California Page 4 <br /> A soil sample for lab analyses will be cut from the acrylic tube using a hacksaw and will be <br /> immediately sealed at each end with Teflon film and plastic caps. The sample will then be <br /> labeled, placed in a cooler and maintained at 4 degrees Celsius until delivery to the analytical <br /> laboratory. The samples will undergo chain of custody protocol. McCampbell Analytical <br /> Laboratory (DHS ELAP Certification #1644) will perform all of the lab analyses. Their lab report <br /> will include results, the chain of custody form and QA/QC data. The report will be completed <br /> approximately five working days after receiving the samples. This report will be included in the <br /> final site report prepared by CES. <br /> PROJECT SCHEDULE <br /> The Septic Drainfield Investigation will be completed within 30 days after the RWQCB approves <br /> this work plan. Results of the laboratory analyses and a schedule for the investigation of the <br /> drain field will be forwarded to the RWQCB within 60 days after RWQCB approval of this work <br /> plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.