Laserfiche WebLink
8700 Thornton Road 0 • <br /> Page 5 <br /> Work Plan—Soil Boring Installation <br /> ' GPE Project No.639.2 <br /> May 18,2011 <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geo-Phase Environmental Inc. in accordance with <br /> ' accepted geologic and hydrologic standards of the State of California accepted and in <br /> effect at the time of this investigation. Geo-Phase Environmental Inc. is not responsible <br /> ' for undisclosed conditions. <br /> This work plan was prepared by: <br /> Geo-Phase Environmental Inc. <br /> ' Stephen M. Lankford, <br /> CA Professional Geologist #4283 <br /> 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />