My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
2900 - Site Mitigation Program
>
PR0542087
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:52:34 PM
Creation date
5/8/2020 3:43:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542087
PE
2965
FACILITY_ID
FA0016554
FACILITY_NAME
ESCALON CITY OF WATER TREATMENT PLA
STREET_NUMBER
25100
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 RIVER RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California R14ional WaterQ Yualit ftntrol Board <br /> Central Valley Region <br /> " <br /> J b <br /> Steven T. Butler,Chair <br /> Winston 11. ttickox Cray Davis <br /> Secrciaiyfor Sacramento Main Office Governor <br /> Environmental Internet Address: h::p:'.NN-%%-Nv.swreb.ca.gov/—r%vqcb5 <br /> Protection 3443 Routier Road.Suite A-Sacrarnenlo,California 95327-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 17 April 2000 <br /> Mr. Doug Stidham, City Engineer <br /> City of Escalon <br /> 1854 Main Street <br /> Escalon, CA 95320 <br /> REQUEST FOR TECHNICAL REPORT, GROUNDWATER MONITORING Ii'ORKPLAN <br /> CITY OF ESCALON WASTEWATER TREATMENT PLANT, ESCALON, SAN JOA QUIN <br /> COUNTY <br /> Recent assessment of wastewater disposal at the Cite of Escalon's industrial wastewater treatment plant <br /> indicates the need for further evaluation of groundwater quality. Therefore, the City is requested to <br /> prepare a workplan for installation of groundwater monitoring wells at the wastewater treatment plant <br /> located at 25100 River Road, Escalon. The well installation workplan shall be submitted by <br /> 17 May 2000. It is anticipated that the well installation, sampling, and well installation report <br /> preparation can be accomplished by 17 July 2000. <br /> Groundwater monitoring shall be sufficient to eN-aluate groundwater flow direction and impacts to <br /> groundwater quality resulting from site activities. The workplan and well installation report shall be <br /> prepared under the supervision of a registered engineer or geologist and be consistent with the attached <br /> guidance document titled, "Items to be Included in a Monitoring Well Installation Work-plan and a <br /> Monitoring Well Installation Report of Results." <br /> If you have any questions on this request, please telephone me at (91.6) 255-3116. <br /> f <br /> TIMOTHY R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> Lower San Joaquin River Watershed <br /> Enclosure: Well Installation Guidance Document <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> California Environmental Protection Agency <br /> (':\I'r.ler\_ilk.11'lle.\iirr WnllWlu MIIIIY.J.r <br /> Rec;i-cled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.