My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
2900 - Site Mitigation Program
>
PR0542087
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:52:34 PM
Creation date
5/8/2020 3:43:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542087
PE
2965
FACILITY_ID
FA0016554
FACILITY_NAME
ESCALON CITY OF WATER TREATMENT PLA
STREET_NUMBER
25100
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 RIVER RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTINGPROGRAM ORDER NO. • <br /> -5 - <br /> CITY OF ESCALON <br /> WASTEWATER TREATMENT PLANT <br /> SAN JOAQUIN COUNTY <br /> 7. Copies of laboratory analytical report(s). <br /> C. Annual Report <br /> An Annual Report shall be prepared as the fourth quarter monitoring report. The Annual Report will <br /> include all monitoring data required in the monthly/quarterly schedule. The Annual Report shall be <br /> submitted to the Regional Board by 1 February each year. In addition to the data normally presented, <br /> the Annual Report shall include the following: <br /> 1. If requested by Staff, tabular and graphical summaries of all data collected during the year. <br /> 2. An evaluation of the performance of the domestic wastewater treatment system and <br /> evaporation/percolation ponds, as well as a forecast of the flows anticipated in the next year. <br /> 3. An evaluation of the performance of the industrial wastewater treatment system and <br /> evaporation/percolation ponds, as well as a forecast of the flows anticipated in the next year. <br /> 4. An evaluation of the groundwater quality at the wastewater treatment facility. <br /> 5. A summary data table of water levels and freeboard in the storage ponds. <br /> 6. A discussion of compliance and the corrective action taken, as well as any planned or proposed <br /> actions needed to bring the discharge into full compliance with the waste discharge <br /> requirements. <br /> 7. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system <br /> or reporting program. <br /> The Discharger shall implement the above monitoring program as of the date of this Order. <br /> GARY M. CARLTON <br /> (Date) <br /> TRO:4/14/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.