My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
2900 - Site Mitigation Program
>
PR0542087
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:52:34 PM
Creation date
5/8/2020 3:43:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542087
PE
2965
FACILITY_ID
FA0016554
FACILITY_NAME
ESCALON CITY OF WATER TREATMENT PLA
STREET_NUMBER
25100
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 RIVER RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> 3ie <br /> J <br /> Central Valley Region <br /> Steven T.Butler,Chair Gray Davis <br /> Winston H.Hiekox Governor <br /> Secretaryfor Sacramento Main Office <br /> Environmental Internet Address: http://www.swrcb.ca.gov/—rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> C:;r <br /> 18 August 2000 --� <br /> e V <br /> aV <br /> Mr. Doug Stidham, City Engineer <br /> City of Escalon <br /> 1854 Main Street •• <br /> Escalon, CA 95320 <br /> CONDITIONAL APPROVAL OF GROUNDWATER AND SURFACE WATER MONITORING <br /> WORK PLAN, CITY OF ESCALON WASTEWATER TREATMENT PLANT, SAN JOAQ UIN <br /> COUNTY <br /> I have reviewed the 28 July 2000 "Groundwater and Surface Water Monitoring Work Plan, City of <br /> Escalon Waste Water Treatment Plant, "prepared by Geological Technics,Inc. The plan was prepared <br /> in response to Regional Water Board correspondence dated 17 April 2000 requesting that the City of <br /> Escalon improve the groundwater monitoring network at the City owned wastewater treatment plant. <br /> After reviewing the workplan, I have one comment: <br /> 1) Please provide a table that summarizes the following sample collection infonnation: <br /> — A description of the size and type of sample containers. <br /> — Identification of any preservatives that will be used, including ice. <br /> — A statement of whether samples will be filtered or not. <br /> — A list of the holding times for each analysis method. <br /> The workplan is approved on the condition that the above comments are addressed in an addendum letter <br /> to be submitted prior to performing the sample event. If you have any questions on this conditional <br /> approval,please telephone me at (916) 255-3116. <br /> TIMOTHY R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> San Joaquin River Watershed <br /> cc: Mr. Mike'H , San Joaquin County Environmental Health Department, Stockton <br /> Mr. Raynold Kablanow, Ph.D., Geological Technics, Modesto <br /> California Environmental Protection AQencv <br /> Recycled Paper <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.