Laserfiche WebLink
Page of <br /> 9. SPILL/OVERFILL CONTAINMEN F BOXES <br /> Facility is Not Equipped With SpUl/Overfill Containment Boxes ❑ <br /> Spill/Ovetfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer , ❑Industry Standard ❑Professional Engineer ' <br /> ❑Other(Spee) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑other(Specify) <br /> Test Equipment Used:Wayne Peng Inc. See Attached Results Equipment Resolution:.0007 <br /> ti ,..ti_'ss#1"s4•fa;;�r9>�,�*."�G� +.�t��s ^`icF;�w:x„tF'.°.'`°�I.t; yi.�� � t.:.+`� z, :c�S=l:.*:::�,r 'se s.�.,s.t.Tr� _q,;R`: 't.'�t�ii <br /> Spill/Overfill Containment Box Number <br /> Bucket Diameter: /y" t 2" 12, <br /> ! <br /> Bucket Depth: 12%' /2 <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min 15 No 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> starting test ' <br /> Test Start Time: /a• /�, z ,D,:i v /Z%, <br /> 3u j <br /> Initial Reading(Rr): 12,113 z — <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(Rp-RO: ._ c e- .c,vi 4'_3 <br /> Pass/Fa: Threshold or <br /> Criteria: _0.0020 -00020 -0.0020 -0.0020 4.0020 -00020 -00020 -00020 <br /> Test Result: <br /> IN Pass 8 Pass ® Pass a Pass. ' El Pass `` ❑ Pass ❑ Pass ❑'Pass <br /> ❑ Fail ❑ Fail 0 Fail ❑ Fail. p Fail ❑ Fail ❑ Fair _❑ Fail <br /> i <br /> Comments—(include infor»ration on repairs made prior to testing,and recoinmended follow-up for'failed tests) <br /> l <br /> i <br />