My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 1:11:57 PM
Creation date
5/8/2020 3:44:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page of <br /> _ 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: T ❑Pressure [❑Vacuum `— ®Hydrostatic <br /> ❑Other(Specify) _ <br /> Test Equipment Used: Wayne Perry Inc. BquipmentRcsoiution:.0007" <br /> Sump# Sump# 'g. Sump# .. _9 j... Surap <br /> Sump Diameter: " <br /> Sump Depth: <br /> 4 � � <br /> Sump Material: .e d 1 � / tiro <br /> Height from Tank Top to Top of 25" <br /> i <br /> Highest Piping,Penetration: J� _ j <br /> Height from Tank Top to Lowest j <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> T'ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2,,ABOVE HIGHEST <br /> Portion of Sum I <br /> P Tested! _ PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATIOI 1 <br /> Does turbine shut down when _ <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time FNA NA NA <br /> Is system programmed for fail-safees ❑No ®NA ❑YesE]No ®NA ❑Yes ❑No ®NA ❑Yes [INo ®NA <br /> shutdown?`Was fail-safe verified to be es ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA Cl Yes ❑No ®NA <br /> o rational?i ---- j <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: _ <br /> Test Start Time: -S 3 2 6F'.12.,/9 <br /> Initial Reading'(R): W17 ,S', 1- Z,/5-2 %23 2. I 7/ <br /> Test End Time: ; `!v 7=y / 2: ' r 2,`5'SV 4:23 <br /> Final Reading(RF): i7 5'31'1 -$3S� �.� S d z: 1./7/ .171z- <br /> 1! <br /> /z- <br /> I <br /> Test Duration: 15 Min 15 Min 15 Min 15 Mn 15 Min 15 Min 15 Min I5 Min { <br /> Change in Reading(R�Rr}: rJr.. 10.001 Z x ve)` o,00Pe> <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 .0.0020 40.00 0 -0.0020 -0.0020� -0.0020 -0.0020 <br /> - i ,. ac `sari Baa i `5i' <br /> 553 s. <br /> r i .y 4 <br /> Was sensor removed for testing? lames ❑No ❑NA 53-Yes [INo ❑NA 2 Yes ❑No ❑NA W Yes ❑No [I NA <br /> Was sensor properly replaced and ®..yes ❑No ❑NA p-Yes ❑No ❑NA RJ'Yes ❑No ❑NA pYes ❑No ❑NA <br /> verified functional after testin <br /> Comments—(include in omiation on repairs made p7iorto testing,and recommended follow-u or failed tests) <br /> i <br /> i <br /> 8P#06080 <br /> _35 E.. Louise Ave <br /> Lathiop, Ca ' I <br /> D4475 SB989 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.