My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 11:54:19 AM
Creation date
5/8/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:1 92 5551 7888 Main Fax GETTLER RYAN INC 3:18 p.m. 10-16-2007 6/10 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES [] NO V <br /> 2. Manufacturer's spec sheets attached for all equipment to be installed YES [yf NO [] <br /> 3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> RE-121 ACE A POS11ION SENSITIVE SENSOR(PIN 794380-123)IN IMF 89 STIR SI IMP <br /> 4. Description of equipment to be used(Attach drawings/blueprints as necessary): <br /> VEEDER-ROOT POSITION SENSITIVE PANISUMP SENSOR(794380-323) <br /> 5. All equipment is State certified or approved. YES V NO [] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( ) <br /> Address City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br /> Hauler Name Phone( ) Hauler Reg# <br /> Address City Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler: <br /> Name Phone( ) <br /> Address City Zip <br /> Hauler Registration #(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone( ) <br /> Address City Zip <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 8. Is the sampling firm an independent third party from the contractor? YES [] NO [] <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br /> 10. Handling of excavated soil(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone( ) <br /> Address City Zip <br /> b) If soil is not to be hauled, describe what will be done with it: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.