My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 11:54:19 AM
Creation date
5/8/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h BP West Coast Products LLC <br /> b p <br /> 4 Centerpointe,LPR 4440 <br /> La Palma,California 90623F <br /> Mailing Address: ..` c2z)) <br /> PO Box 6038 F/�' 1�, <br /> Artesia,CA 90702-6038 00� <br /> �F y'F/V1 <br /> Voice(503)524-6191 <br /> Fax(714)670-5420 <br /> Email ruth.ha@bp.com <br /> October 19,2007 <br /> Via FedEx <br /> Tracking#7992 0571 4648 <br /> Toau Yang <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA <br /> RE: Inspection Report <br /> ARCO Facility No. 6080 <br /> 85 E. Louise Avenue <br /> Lathrop, California <br /> Dear Mr. Yang: <br /> This letter has been prepared to provide a follow-up to the Inspection for ARCO Facility <br /> No. 6080 located at 85 E. Louise Avenue in Lathrop, California dated September 27, <br /> 2007 (Attachment A). <br /> The inspection report stated that there were issues with the record keeping and Stage I <br /> equipment at the site. The following is BP's response to the items noted during the <br /> inspection. <br /> • CCR 2712(b): Maintenance&monitoring records—Alarm monitoring records are <br /> not accurate. Monitoring records/logs shall include date alarm occurred,type of <br /> alarm, and how alarm was investigated and corrected. Begin this practice <br /> immediately. <br /> The Inspection Report states that at the time of the inspection, the alarms were not being <br /> documented in the alarm monitoring logs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.