Laserfiche WebLink
'3. Piping Leak Detection MIto <br /> Equipment <br /> MonitoringMethod Manufacturer Model MonitoringFrequency <br /> Sump leak sensors connecteVeeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> ❑ Non-discriminating <br /> ® Mechanical line leak detectors with Red Jacket FXIV <br /> programmed leak threshold of three Vaporless LD-2000 Every pumping cycle <br /> alIons per hour <br /> Electronic line leak detectors with <br /> programmed leak threshold of: Every pumping cycle <br /> ❑ 0.1 gph ❑0.2 9ph ❑3 gph <br /> Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑ Other: <br /> ❑Third party testing <br /> Not required <br /> ❑Other(Specify): <br /> 4. Dispenser Leak Detection Monito ing Equipment <br /> Monitoring MethodManufacturer Model MonitorinQ Frequency <br /> ❑ Mechanical float in dispenser <br /> containment <br /> i Continuous <br /> Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> ❑ Discriminating Continuous <br /> ® Non-discriminating <br /> r-1El Daily <br /> Visual inspection ❑Other: <br /> No under-dispenser containment <br /> ❑ Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> El System does not have positive shutdown capabilities <br /> Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> Automatic pump shut off will occur whenever: <br /> ® Release is sensed in turbine sump <br /> ® Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ® Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑ Other(specify): <br /> 6. Secondary Containment Testing <br /> ❑ Secondary containment is not tested <br /> ® In the State of California,secondary containment systems installed on or after January 1,2001, shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br /> shall be tested by January 1,2003, and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testin <br /> ®Annually <br /> ❑ Other(specify): <br /> 2 <br />