Laserfiche WebLink
Baseline Monitorin�eport (continued) • <br /> f Page 2 <br /> D. Number of employees 43 <br /> Shifts per day 2 <br /> Months operating per year 12 <br /> E. SIC N(s) <br /> 3. Wastewater Flow: <br /> A. Total plant flow in gallons per day (gpd) Average 18,668 Maximum <br /> B. Individual process flows in gpd, <br /> Process Average Maximum Type-Batch, continuous, none <br /> Film processor 825 continuous <br /> Etch Dept. rinse 16,257 continuous <br /> Screen stencil wash 12.5 batch <br /> washing machine 6 batch <br /> Cooling Water 1,030 continuous <br /> Sanitary Water 537.5 <br /> C. Provide on a separate sheet <br /> 1 ) A schematic drawing of flow chart of each regulated process that <br /> generates wastewater. N/A <br /> 2) A schematic drawing showing all wastewater flows, regulated or unregulated <br /> location of any treatment systems, and sampling locations. <br /> See attached sheet. <br />