My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:34:33 AM
Creation date
5/11/2020 11:14:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_--....,-...___._ . Lifetime LUSTRE-CAL NAMEPLATE CORPORATION <br /> Metal P.O. Box 439 • Lodi, CA 95241-0439 <br /> Nameplates <br /> kq, 110 E. Turner Rd. Lodi, CA 95240 • (209) 334-NAMEplate(6263) <br /> LustresCat.k,. _ <br /> October 24, 1985 oC <br /> T <br /> State of California �_^• �9pU <br /> Northern California Section r . �" (0CA, <br /> i Toxic Substance Control Division <br /> f Department of Health Services <br /> 4250 Power Inn Road <br /> Sacramento, CA 95826 <br /> 1 ATTN: James T. Allen <br /> SUBJECT: Docket No. HWCA 84/85-002 <br /> Stipulation to Order Specifying Schedule for Compliance or <br /> Correction <br /> REF : Schedule for Compliance or Correction <br /> iPages 6 & 7 - Paragraph Labeled N8. <br /> REPORT TITLE: "Plan for Sealing Empty Underground Concrete Bunker; <br /> j Accompanied With Soil Sampling Plan." <br /> I . Proposed Bunker Sealing Procedures. <br /> f <br /> A. Bunker will be filled two-thirds full of water to prevent "floating" <br /> i out of the ground during the wet season. <br /> B. The three external openings into the bunker will be sealed with <br /> reinforced concrete. <br /> 1 . Concrete will be a minimum of 5 inches thick. <br /> 2. Concrete will be a 5 sack mix. <br /> 3. Re-bar will be J" on 8" centers. <br /> C. The "old" metal pipes leading into the bunker through the south and <br /> west walls will be sealed as follows: <br /> 1 . The pipes will be plugged on the internal side of the wall prior <br /> to sealing bunker. <br /> D. All work will be performed by Lustre-Cal personnel . <br /> i <br /> It. Proposed Soil Sampling Plan For Bunker. <br /> A. Soil samples will be taken and immediately transferred to the lab for <br /> analysis within 15 days of receipt of approval of the sampling plan. <br /> • "'SPEC1Ai1STS 1N CUSTOM MADE COLOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.