Laserfiche WebLink
Past Costs for the City of Lodi, Lustre-Cal Nameplate <br /> Corporation, Busy Bee Laundry and Dry Cleaners, <br /> and Guild Cleaners <br /> 1 . Cost incurred by URS Phase Z investigation: scope of <br /> investigation included file review of historical and current <br /> information collected by public and private sectors, sewer <br /> sampling, hydropunch sampling of groundwater at shallow <br /> groundwater table and deeper aquifer) , soil gas sampling, <br /> and report preparation. <br /> City of Lodi : $93, 433 .51 (drilling cost at deeper <br /> aquifer - 50 , to 1001 ) <br /> Lustre-Cal : $91, 456 .68 (costs for drilling at shallow <br /> groundwater table, soil gas, <br /> Guild: $76, 471 .79 file review, and sewer <br /> sampling) <br /> Busy Bee: $35, 160 .77 <br /> ---------------------------- <br /> Total = $296, 522 . 75 <br /> DISC DISC <br /> URS + FY 95&96 + FY 92&94 = TOTAL <br /> 2 . City <br /> Past Cost $93, 433 . 51 + $14, 446 .24 + $77, 816 .27 = $185, 696 .12 <br /> 3 . Guild $ (9, 598 . 08 <br /> Past Cost $76, 471 .79 + + + $89, 446 .77 = $196, 513 .13 <br /> $10, 996 .49) <br /> 4 . Lustre-Cal $ (8, 625 .68 <br /> Past Cost $91 , 456 .68 + + + $73 , 813 .71 = $184, 892 .56 <br /> $10, 996 .49) <br /> 5 . Busy Bee $ (8, 761 .24 <br /> Past Cost $35, 160 .77 + + + $60, 188 . 64 = $115, 107 .14 <br /> $10, 996 . 49) <br />