Laserfiche WebLink
Memorandum <br /> June 28 , 1996 <br /> Page three <br /> CALCULATIONS AND RESULTS <br /> Itemized costs incurred by each contractor at each site are <br /> summarized in Table 1 . The City' s share on groundwater <br /> investigation costs is shown in Table 2 . <br /> CONCLUSIONS <br /> As shown in Table 2, the total contract cost for DTSC' s <br /> phase I investigation is $296, 522 .45 . Lustre-Cal' s, Guild' s, <br /> Busy Bees, and the City of Lodi' s allocation shall be : <br /> $91, 456 , 68 , $76 , 471. 83 , $35 , 160 .47, and $93 ,433 .47, respectively. <br />