My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
samples to assess whether these data are consistent with method requirements. Upon request,the <br /> laboratory will make available all supporting documentation in timely fashion. <br /> 9.4 Scheduling <br /> Audits will be scheduled in the event discrepancies are identified. The overall frequency of audits <br /> conducted for these activities will be based on the importance and duration of work, as well as <br /> significant changes in project scope or personnel. <br /> 9.5 Reports Management and Responsibilities <br /> Upon completion of any audit, the auditor will submit to the Project/Field Manager a report or <br /> memorandum describing any problems or deficiencies identified. It is the responsibility of the <br /> Project Manager to determine whether the deviations will result in any adverse effect on the <br /> project conclusions. If it is determined that corrective action is necessary, procedures outlined in <br /> Section 9.6 will be followed. <br /> 9.6 Corrective Action <br /> Corrective actions will be initiated whenever data quality indicators suggest that DQOs have not <br /> been met. Corrective actions will begin with identifying sources of the problem. Potential <br /> problem sources include failure to adhere to method procedures, improper data reduction, <br /> equipment malfunctions, or systemic contamination. The first level of responsibility for <br /> identifying the problems and initiating corrective action lies with the analyst/field personnel. The <br /> second level of responsibility lies with any person reviewing the data. Corrective actions may <br /> include more intensive staff training, equipment repair followed by more intensive preventive <br /> maintenance program, or removal of the source of systemic contamination. Once resolved, the <br /> corrective action procedure will be filly documented and if DQOs were not met, the samples in <br /> question must be recollected and/or reanalyzed using a properly functioning system. <br /> Environmental/LNC/workplan/Appendix3.wpd 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.