My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3.2.4 Relationship Between Final Canister Vacuum, Volume <br /> Sampled, and Dilution Factor (6 L Canister) <br /> Final Vacuum (in. Hg) 0 2.5 5 7.5 10 12.5 15 17.5 20 <br /> Volume Sampled (L) 6 5.5 5 4.5 4 3.5 3 2.5 2 <br /> Dilution Factor* 1.34 1.46 1.61 1.79 2.01 2.30 2.68 3.22 4.02 <br /> Canister pressurized to 5 psig for analysis <br /> was high. Once the vacuum decreases below 5 in. Hg, the flow rate begins to drop significantly. <br /> This scenario indicates that the sample is skewed in favor of the first portion of the sampling <br /> interval. <br /> • If the final vacuum is near ambient (i.e., less than I in. Hg), there is inadequate differential <br /> pressure to drive the flow controller. The sampler cannot be certain the desired sampling interval <br /> was achieved before the canister arrived at ambient conditions. The sample could have been <br /> acquired over a 1-hour interval (which would be the case if the connection between the canister <br /> and flow controller leaked or if the flow controller malfunctioned) or a 24-hour interval. Al- <br /> though the actual sampling interval is uncertain, the canister still contains sample from the site. <br /> 3.2.5 Considerations for Integrated Sampling with Canisters <br /> Collecting an integrated air sample is more involved than collecting a grab sample. Sampling <br /> considerations include verifying that the sampling train is properly configured, monitoring the <br /> integrated sampling progress, and avoiding contamination. <br /> • Avoid Leaks in the Sampling Train: See Section 3.1 for instructions on how to securely <br /> assemble sampling hardware. A leak in any one of these connections means that some air will be <br /> pulled in through the leak and not through the flow controller. A final pressure near ambient is <br /> one indication that there may have been a leak. <br /> • Verify Initial Vacuum of Canister: See Section 3.1. for instructions on verifying initial canister <br /> vacuum. If you are using an Air Toxics Ltd. critical orifice flow controller, note that you can use <br /> the built-in gauge. It is important to note both the canister and flow controller serial numbers on <br /> the chain-of-custody. <br /> (CD-A I R TOXICS LTD. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.