My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction diagrams for the shallow SVE wells are presented as Figure 14. Locations of the <br /> wells are presented in Figure 11. <br /> 6.2.4 Groundwater Monitoring Well Installation and Development <br /> One 2-inch diameter Schedule 40 PVC groundwater monitoring well will be drilled and <br /> completed(LNC-MW 1) in the southern portion of the LNC site (Figure 11). The groundwater <br /> monitoring well will be drilled to a depth of 60 feet bgs. It is anticipated that the lower 20 feet of <br /> the well will be screened spanning the first groundwater bearing zone with 10 feet below the <br /> water surface and 10 feet above the groundwater surface. Blank casing will be placed in the <br /> wellbore to the surface. <br /> A coarse-sand filter pack will be placed from the bottom of the screen zone up to approximately <br /> 2-feet above the top of screen interval. A bentonite seal approximately 2-feet thick will be <br /> placed on top of the sand pack, and cement-bentonite grout will seal the remaining annular space. <br /> A completion plan for the monitoring well is depicted in Figure 16. <br /> Approximately forty-eight (48) hours after installation, the groundwater monitoring well will be <br /> developed to remove fines and settle the filter pack. This will be accomplished using the `surge <br /> blocking and bailing' method and/or pumping using a submersible pump. It is anticipated that at <br /> least ten(10)well casing volumes will be removed from the well during development.Groundwater <br /> quality parameters of pH, temperature, electrical conductivity and dissolved oxygen will be <br /> monitored during development and recorded on a well development form. <br /> Purged groundwater will be placed in a series of 55-gallon USDOT approved drums and labeled. <br /> Main\D:AEnvironmentaI\LNCV\10152007.wpd 38 <br />