Laserfiche WebLink
11.0 PROJECT MANAGEMENT AND SCHEDULE <br /> During the current phase of the investigation, Mr. Stephen Muir, Certified Engineering Geologist <br /> #1224, will be the Project Director. His duties will include coordinating field and laboratory <br /> investigations and coordinate with LNC management and the RWQCB staff. Mr. Muir will be <br /> assisted by Mr. Kit H. Custis, Project Manager. His duties will include direction of the field <br /> investigations. The Project and Site Safety Director will be Mr. Stephen G. Muir. <br /> Soil boring and monitoring well installation will be conducted by V&W Drilling and/or D&S <br /> Dragline Service Inc. The project analytical laboratory will be Air-Toxics, Folsom, California <br /> for soil gas samples and Kiff Analytical, Davis, California for soil and groundwater samples. <br /> M ain\D:AEnvironmentaI\LN CV\10152007.wpd 69 <br />