Laserfiche WebLink
■SLI INC <br /> I <br /> PPE required for each lob task depends on the chemical and physical hazards expected <br /> of that task, as described above The following PPE ensembles are assigned to project <br /> tasks <br /> Task Assigned PPE Ensemble <br /> 1 Exploratory Trenching Level D <br /> B. Site Control <br /> Initial Site Entry <br /> The WZI Project Manager shall arrange an initial site briefing with the WZI Health and <br /> Safety Officer (HSO) Based on the information provided in this initial site briefing and <br /> on the nature of magnitude of known or suspected site contaminants and the work plan <br /> tasks, the HSO shall determine initial site entry procedures and shall specify them below <br /> It is the responsibility of the Site Safety Officer (SSO) to implement these procedures and <br /> direct proper site entry <br /> Personal Protective Equipment (PPE) ensemble for personnel to wear during initial site <br /> entry <br /> Level D with respirator available Respirator shall be half mask with organic vapor <br /> cartridges (color-coded black and gray) <br /> If Level C PPE is required for initial site entry, then all personnel MUST carry a 5 minute <br /> escape air bottle <br /> Appendix IV <br /> Page 8 <br />