Laserfiche WebLink
i <br /> VrZ1 INC <br /> • F. Trenching and Excavation Safety Procedures <br /> G. Decontamination <br /> Personnel <br /> Personnel will wear Tyvek garments and gloves These will be disposed of on-site <br /> Equipment <br /> i <br /> 1 Wash down on-site and rinse with clean water <br /> H Procedures for Disposal of Wastes and Derived Materials <br /> 7 All waste water and soil will be placed on contaminated sod pile and covered <br /> I. Site Safety Meetings <br /> Before beginning site work the SSO shall conduct a site safety meeting to discuss the <br /> following the tasks to be performed, the safe work practices to be followed to minimize <br /> exposure to chemical and physical agents and to minimize accidents <br /> The SSO shall document the date, time, and attendance of all site safety meetings together <br /> with a short description of the topics discussed in Appendix A of this Plan <br /> Appendix IV <br /> Page 15 <br />