My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008383
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
ARCHIVED REPORTS_XR0008383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:01:06 PM
Creation date
5/11/2020 11:24:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008383
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Page 3 <br /> Traffic-proof, flush mounted steel well covers will be placed over each well to <br /> provide protection and ensure future access to the well. <br /> All PVC materials will be cleaned with a high-pressure, hot-water washer prior <br /> to being installed to the drive holes <br /> 1 � <br /> BOREHOLE GROUTING <br /> On completion of soil and water sampling, boreholes will be abandoned with a <br /> grout mixture of Type 11 cement with 4% pure sodium bentonite The grout will be <br /> pumped through a 1-inch-diameter grouting tube positioned at the bottom of the <br /> boreholes, prior to withdrawing the outer rods <br /> SOIL VAPOR SAMPLING <br /> Soil vapor samples will be collected using probes constructed of 1 0"-outside- <br /> diameter, 0 80"-inside-diameter stainless steel pipe with expendable steel drive <br /> points The probes are either pushed or vibrated into the ground in three-foot <br /> threaded sections When the prescribed depth is reached, the probe is pulled <br /> ' up to expose the desired sample interval, leaving the expendable tip in place <br /> The top of the vapor probe is then coupled to a Tedlare bag YAthin a sealed <br /> vacuum box using 914"-diameter Teflon tubing. The vacuum box is evacuated <br /> with an electric or hand vacuum pump, allowing the sample bag to tall with soil <br /> vapor from the sample interval A minimum of one probe volume <br /> (approximately 6 cubic inches per vertical foot of probe) will be purged from the <br /> ' probe before a sample is collected <br /> Once the sample is collected, soil vapor probes are removed from the ground <br /> with the sampling rig The resulting hole is then abandoned with a cement- <br /> bentonite grout <br /> 1 <br /> ffwkeMpro&)c <br />
The URL can be used to link to this page
Your browser does not support the video tag.