My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
17725
>
2900 - Site Mitigation Program
>
PR0526486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:22:25 PM
Creation date
5/11/2020 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526486
PE
2965
FACILITY_ID
FA0017927
FACILITY_NAME
LOCKEFORD COMMUNITY SVCS DIST
STREET_NUMBER
17725
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05303039
CURRENT_STATUS
01
SITE_LOCATION
17725 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents <br /> Lockeford CSD — Groundwater Monitoring Well Installation <br /> Workplan <br /> INTRODUCTION AND BACKGROUND................................................................................1-1 <br /> 1.1 Introduction................................................................................................. 1-1 <br /> 1.2 Site Soils, Geology, and Hydrogeology...................................................... 1-1 <br /> 1.2.1 Geology and Soils - <br /> ................................................................ <br /> 1.2.2 Shallow Croundwater Occurrence.............................................................. 1-2 <br /> GROUNDWATER MONITORING WELL INSTALLATION...................................................2-1 <br /> 2.1 Monitoring Well Locations and Rationale..................................................2-1 <br /> 2.2 Equipment Decontamination Procedures....................................................2-1 <br /> 2.3 Health and Safety Plan................................................................................2-2 <br /> 2.3.1 Personal Protective Equipment...................................................................2-2 <br /> 2.3.2 Emergency Procedures................................................................................2-2 <br /> 2.4 Regulatory Permits......................................................................................2-2 <br /> 2.5 Monitoring Well Design.............................................................................2-2 <br /> 2.6 Well Development......................................................................................2-4 <br /> 2.7 Well Disinfection........................................................................................2-4 <br /> SURVEYINGAND SAMPLING............................................................................................3-1 <br /> 3.1 Surveying....................................................................................................3-1 <br /> 3.2 Soil Sampling..............................................................................................3-1 <br /> 3.3 Well Water Sampling..................................................................................3-1 <br /> 3.3.1 Water Level Measurements ........................................................................3-1 <br /> 3.3.2 Purging 3-1 <br /> 3.3.3 Sample Collection.......................................................................................3-2 <br /> 3.3.4 Quality Assurance/Quality Control.............................................................3-4 <br /> 3.3.5 Decontamination.........................................................................................3-4 <br /> 3.3.6 Field Forms.................................................................................................3-4 <br /> 3.3.7 Sample Shipment and Chain of Custody....................................................3-5 <br /> 3.4 Schedule......................................................................................................3-5 <br /> TABLES <br /> Table 3-1 Groundwater Monitoring (Field, Calculated, and Laboratory)......................3-3 <br /> Table 3-2 Tentative Schedule of Well Completion (2005) ............................................3-6 <br /> March 2006 Lockeford CSD <br /> i Groundwater Monitoring Well Installation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.