My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:48:51 PM
Creation date
5/11/2020 12:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUN. -28' 99 (MON) 13 13 LEGAL aI F 3568 TEL 213 W 3969 P. 002 <br /> \� AR <br /> ARCO 644 SOUInoule <br /> Fawet$ileal <br /> Los Nx]eles.Cadoma 90071.1406 <br /> Tdepnone 1213)466.2435 <br /> _ Beth S.Dorris <br /> Senor Al ropey <br /> June 25, 1999 <br /> Douglas Wilson, Supervising R_E.H.S. Via Facsimile and US Mail <br /> Public Health Services <br /> San Joaquin County Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,California 95202 <br /> Facsimile: 209 464-0138 <br /> Re: Construction Permits for Minor Upgrades at ARCO Service Stations at <br /> 6100 N Highway 99 and 85 W. Louise(the"Sites" <br /> Dear Mr. Wilson: <br /> This letter is to advise you that ARCO has contacted a local contractor,Henderson,to <br /> prepare and file an application for a permit from your department. The application is for removal <br /> of the concrete above piping on both sides of the fuel islands to confirm that the piping is <br /> fiberglass. The permit application will consist of a sketch on a site plan showing where to break <br /> concrete,a fee payment to your department,and a Health and Safety Plan. Henderson has <br /> initiated the permit application process. We asked if the contractor could get an application in by <br /> 5 today,but were advised us that Henderson could not pull the site plans,complete the sketches <br /> and otherwise provide the most basic information in that time period. Henderson is striving to <br /> have the application in by Monday. We are hopeful that this application will suit your needs. In <br /> light of recent experience in permining with your department,we would like to ensure that the <br /> appliuuion contains the information you would like to see. Please let us know if there arc any <br /> other pieces of information you need to process the application, and Henderson will assemble that <br /> as well. <br /> Very truly yours, <br /> Beth S. Dorris <br /> cc, David Ircy, Esq. <br /> Franklin Stevenson, Esq. <br /> ZO - d OSZ9 V29 916 -03 S1OnGOHd 03HV d1 t = Z0 66-8Z-unC <br />
The URL can be used to link to this page
Your browser does not support the video tag.