My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:48:51 PM
Creation date
5/11/2020 12:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Fire and Explosion <br /> The presence of volatile liquids and vapors at this site presents the potential for fire or explosion <br /> during the excavation. The following precautions will be taken during the project to prevent fire <br /> or explosion: <br /> 1. There will be NO SMOKING within a 50 foot radius from the <br /> source of any vapors. <br /> 2. The atmosphere at the site will be continually monitored for the <br /> presence and concentration of flammable vapors and measurements <br /> will be documented in writing. <br /> 3. Two 10 A-20 B:C fire extinguishers will be maintained on site <br /> within 50 feet of the line of travel of the on-ground person <br /> designated as fire watch at all times, <br /> 4. During refueling of vehicles and heavy equipment, the engines of <br /> the equipment will be required to be off. There must be metal to <br /> metal contact between the refueling equipment and vehicle/heavy <br /> equipment being refueled. No combustion sources will be allowed <br /> with 25 feet of refueling operations. <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> Level D PPE will be required on site at all times, The following table will guide upgrades from <br /> this level of protection: <br /> Consistent-Sustained <br /> Breathing Zone <br /> PID Reading Level of Protection <br /> <10 ppm Level D <br /> 10 - 100 ppm Level D + half-mask air purifying <br /> respirator <br /> 50 - 500 ppm Level D + full-face air purifying <br /> respirator <br /> >500 ppm Level D + SCBA <br /> Descriptions of the different levels of protection are found in Appendix A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.