My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:48:51 PM
Creation date
5/11/2020 12:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Leak Detector Test Data Sheet <br /> ARCO Products Company <br /> Station # O — Date 5�p 20 <br /> Address <br /> Test InFortnation <br /> 1 2 3 4 5 <br /> Product <br /> Manufacturer <br /> Model 20� <br /> Full Operating Pressure (psi) l <br /> Line Bleed Back (ml) 4 <br /> Trip Time (sec) <br /> Metering Pressure (psi) <br /> F/E Holding Pressure (psi) Q <br /> Test Leak Rate (ml/min) (gph) <br /> PASS or FAIL <br /> L <br /> Replaced All Failed Leak Detectors Yes No N/A <br /> If No, Replacement To Be Completed By (Date) / <br /> This letter certifies that the annual leak detector tests were performed at the above referenced facility <br /> according to the equipment manufacturers procedures and limitations and the results as listed are to my <br /> knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow threshold <br /> trip rate of 3 gph at 10 PSI. <br /> Inspected By: Contractor S e:, ' <br /> Technician /1 " Lic# <br /> Signature <br /> APC•3325 <br /> Sib'd ZLb'ow 0D iiO3s WdZZ :2 2002'8 'bdW <br />
The URL can be used to link to this page
Your browser does not support the video tag.