My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:48:51 PM
Creation date
5/11/2020 12:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPMATING POSITIONS <br /> EEi <br /> Full Pump Full Pump Full Pump <br /> Pressure Pressure Press re <br /> 1 <br /> 04 <br /> �psi 5-18 <br /> psi Full Pum <br /> \\\\\ \ P <br /> Pressure <br /> POSITION I -Position 1 is the POSITION 2-When pressure in the POSITION 3 -If the pressure <br /> "tripped"or"reset"position.The LD- delivery system has reached 12-15 psi, continues to rise, the 'r'` <br /> Y�3? <br /> 2000 goes into this position when the the piston and poppet assembly moves LD-2000 will move to •�a; <br /> pressure in the delivery system drops to to Position 2-the"leak sensing"posi- Position 3-the"full flow" <br /> 4 psi or less at the leak detector. tion. position. In position 3, the <br /> LD-2000 will allow full <br /> In the reset position, the LD-2000 is As the poppet moves to this position, flow of product from the <br /> ready to look for a leak in the delivery the cross hole in the poppet centers submersible pump to enter <br /> system the next time the submersible around the head in the metering pin. the delivery system. <br /> pump is turne-d on. With the pump Since the head of the pin is consider- <br /> turned ontthe LD-2000 will allow ably larger than the shaft, flow is <br /> approximately t.5 gallons of product restricted from 1.5 GPM to 3 GPH or <br /> per minute to enter the delivery system less. <br /> through a cross hole in the poppet. <br /> If there is a leak in the delivery <br /> In Position 1, a portion of the cross system of 3 GPH or more,the pressure <br /> hole is positioned around the narrow in the delivery system will not rise, and <br /> part of the metering pin. Pressure will the LD-2000 will stay in this position. If <br /> build very quickly to I2-15 psi.As the there is no leak in the delivery system, <br /> pressure builds in the delivery system, the pressure will continue to rise. <br /> it also increases under the piston in the <br /> top of the LD-2000. This pressure <br /> causes the piston and poppet to move <br /> upward. <br /> For further information about the LD-2000 or other leak detection equipment, <br /> contact your local distributor or call: <br /> VAPORLESS MANUFACTURING, INC. <br /> 9234-C East Valley Road - Prescott Valley, AZ 86314 <br /> 1-800-367-0185 - (602) 775-5191 (602) 775-5309-FAX <br /> 40 Printed on Recycled Paper Made in the United States of America <br />
The URL can be used to link to this page
Your browser does not support the video tag.