Laserfiche WebLink
12/01/2010 WED 15: 47 FAX 2094683433 SJC EHD 12001 <br /> ********************* <br /> *** FAX TX REPORT *** <br /> ********************* <br /> TRANSMISSION OK <br /> JOB NO. 3829 <br /> DESTINATION ADDRESS 919255517888 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID <br /> ST. TIME 12/01 15: 46 <br /> USAGE T 00' 59 <br /> PGS. 3 <br /> RESULT OK <br /> San Joaquin County <br /> OPpU!N' •C Environmental Health Department DIRECTOR <br /> Donna Heran, REHS <br /> 600 East Main Street <br /> [11PROGRAM COORDINATORS <br /> Stockton, California 95202-3029 Margaret Lagorio,REHS <br /> 1 Robert McClellon,REHS <br /> • c .. <br /> Website: www.sjgov.org/ehd Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> December 1, 2010 Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> Liddy McKenzie <br /> Gettler Ryan Inc <br /> 6747 Sierra Court <br /> Dublin, CA 94568 <br /> Re: Arco#6080 SR0061244 <br /> 85 East Louise Ave, Lathrop 95330 <br /> The San Joaquin County Environmental Health Department(EHD) has completed the initial <br /> review of the permit application to install the following underground storage tank(UST) system <br /> at the above noted address: <br /> 20,000 gallon UST(ID#39-000231656-0519980) regular unleaded, <br /> 12,000 gallon UST(ID#39-000231656-0519981)premium unleaded (split tank w/diesel), <br /> 10,000 gallon UST(ID#39-000231656-0519982)diesel (split tank with premium unleaded), <br /> along with the associated piping, four dispensers, turbine pumps, and appurtenances. <br /> 1. Contact the City of Lathrop-Manteca Fire Department and the San Joaquin Valley Air <br /> Pollution Control District for applicable permits. <br /> 2. Contact Thuy Tran, REHS at(209)468-8257 for the following inspections: <br /> a. Delivery and setting of tanks: pre-installation testing per manufacturer's guidelines and <br /> hydrostatic test of the secondary containment collar. <br /> b. Visual inspection of piping to insure proper slope prior to backfill. <br /> c. 24-hour hydrostatic test(or equivalent)on all piping, UDCs, and sumps. <br /> d. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br /> pressure, or 40 psi, whichever is greater on all piping including product piping, vapor <br /> recovery and vent line. <br /> e. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If <br /> there are no manufacturer's guidelines, test shall be performed using an applicable <br /> method specified in an industry code or engineering standard on all piping including <br /> product piping, vapor recovery and vent line. <br /> f. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br /> leak of 3 gallons per hour at 10 psi. <br />