My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#o LEAK DETECTION <br /> TECHNOLOG IESLLc <br /> 1400 East Paseo Pavon • Tucson,AZ 85718 • Phone 520.207.4878 • FAX: 520.509.3720 <br /> • «v.LeakDetect.net <br /> Final ELD Testing Instructions for Owners and Contractors <br /> The state of California requires ELD testing at any facility whenever an <br /> Underground Storage Tank is installed at a new or existing installation. The <br /> NWleaksm Testing Method developed by Leak Detection Technologies is the most <br /> versatile and flexible testing method in today's market. Owners and contactors <br /> require quick and accurate results that can only be found by using the Nmleaksm <br /> testing method. <br /> California requires the industries best available technology to test their <br /> Underground Storage Tanks(UST). These regulations help make California one of <br /> the nation's cleanest states from uncontrolled UST releases. <br /> Standard technologies such as pressure testing cannot detect or locate small leaks to <br /> California's standards. Because small leaks can go undetected Nwleaksm pretesting <br /> should be completed before the final backfilling process is started. <br /> We have completed a check list of expectation to guide the contractor and help <br /> make the site personnel as successful as possible. <br /> Scheduling: <br /> 1. LDT offer services throughout California. Therefore it is important that you <br /> schedule with us around the time the tank pit excavation begins. <br /> 2. Early scheduling makes for an on time arrival of our crews. <br /> 3. Once we have the site scheduled we will contact the contractor by phone two <br /> weeks before the scheduled arrival date to confirm the starting date and again <br /> at one week out. Phone 520-2107-4878,Fax 5210-509-3720, or <br /> info@LeakDetect.net <br /> Timing: <br /> 1. The State requires the fueling system to be completed before ELD testing <br /> can begin. <br /> 2. All finished ground surfaces shall be complete over the underground <br /> petroleum components to be tested <br /> 3. All electrical and communication cabling including, conduit, conduit <br /> connections and covers shall be complete <br /> 4. Spill buckets, fill and vapor adapters,ATG, drop tubes, caps, <br /> 5. Vent risers caped <br /> 6. Ballasted Tanks; LDT can test tanks that are water of product ballasted. <br /> LDT must be notified in advance if the tank/s will be ballasted during the test <br /> Author David Rabb <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.