Laserfiche WebLink
CLIENT: <br /> ............................................ .................. ® NOTES: UST ANCHORINGbp <br /> (6) 1" CONDUITS <br /> 1 TO BUILDING NOTE: WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO ASSURE <br /> WHEN END-TO-END LAYOUTS ARE USED, WORKMEN SAFETY. SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY <br /> 8 5 6O POSITION THE TANKS SO THAT THE FILL Q WITH OSHA CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 <br /> LOCATIONS ARE FACING ONE ANOTHER, SUBPART P, OSHA STANDARDS-EXCAVATIONS: FINAL RULE OCTOBER 1, 1989. <br /> PROVIDING MIN. DISTANCE BETWEEN FILLS HARDHATS SHALL BE WORN BY ALL WORKMEN OPERATING IN EXCAVATION OR <br /> TO FACILITATE TANKER DELIVERIES. WHERE OVERHEAD WORK IS PROGRESSING. <br /> TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR <br /> Qw Q2 IS REQUIRED BY LOCAL REGULATION. CONSULT WITH OWNER'S <br /> 13- 9 -8 1/2" 31 2 1/2 REPRESENTATIVE. GLOBAL FUELS TECHNOLOGY <br /> 0 INSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION 150 WARRENVILLE ROAD <br /> 2'-0" In 4 4 4 <br /> 4 5 41'-3 1/4" 2 _0" 37'-5 1/2" 2'-0" 3 IN R TI NAPERVILLE, ILLINOIS 60563-8473 <br /> I 13 Q DIMENSIONS OF MANUFACTURER SUPPLIED DEADMAN FOR 10' DIA. 22,000 GAL. NATIONAL SITE ADAPT CONSULTANT: <br /> 2 TANK ARE 18%8"x181, QTY: (4) EACH TANK. DIMENSIONS OF DEADMAN FOR <br /> 0 44 54 44 54 44 54 44 54 <br /> 1 g 5 14 1 DIA. 20,000 GAL. TANK ARE 18"x8"x18'L, QTY: 4 EACH TANK. <br /> N <br /> 4 5 Q TOTAL L N tL CO C <br /> 20.000 UNLEADED OVERALL LENGTH OF TANK. <br /> Q6 EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br /> 12,000 8 5 10,000 4 <br /> HOLD DOWN STRAPS ARE REQUIRED FOR 10,000, 12,000, 15,000, & 20,000 <br /> PREMIUMUNLEADED 7 <br /> MANIFOLD; 4 5 4 5 GALLON TANKS AS SPECIFIED AND SUPPLIED BY TANK MANUFACTURER. <br /> I <br /> •. . '� <br /> ®®�t� 8n®r - Ry Inc. <br /> LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br /> t0 cD <br /> I I I IIV <br /> Q :SR ' •� 6747 SIERRA CT. SUITE J <br /> b FASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND <br /> 15 6 9 THROUGH THE END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL BE <br /> DUBLIN, CA 94568 <br /> (9 <br /> 25) 551-7555 <br /> ALTERNATED 180° FROM EACH OTHER <br /> x <br /> 6 <br /> \ 6 8 ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY <br /> 16 1 <br /> 6 8 <br /> MASTER DRAWING RELEASE HISTORYTIGHTEN ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. <br /> o- <br /> _ <br /> 10 <br /> C) <br /> MEASURE TANK DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO <br /> 16 / ENSURE NO <br /> f 17 TANK DEFLECTION. VERSION DATE <br /> SIPHON BAR 4 5 <br /> COXX V-0 MAY 2000 <br /> cl 14 11 WIRE ROPE MINIMUM DIAMETER 1/2". CO <br /> COXX V-1 FEB 2001 c° <br /> O o <br /> iv 14 12 TURNBUCKLES: HOOK TYPE - 1-1/4" DIAMETER, JAW TYPE - 3/4" COXX V-2 JUNE 2001 <br /> DIAMETER, EYE TYPE - 3/4" DIAMETER COXX V-3 JAN 2002 0 <br /> QJ z 44 54 5 5 J w w_ J w f1'= z a a z J� cn J w 5 16 rx= z In of J� 44 54 50 15 Q COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING BARS COXX V-4 JUNE 2002 <br /> fa--o D � O SwF m a-0w� > > vOi �o �`'� awwF � Q� UZ 1 WITH PITCHMASTIC. <br /> Fz to w a ¢¢>0 a a¢>0 cn w Fz cn JQ ¢a>0 -1 � ¢ COXX V-5 FEB 2003 V) <br /> tnO p c� >1-pw O >I. Ow p cnO J c9 ><pW O c9 F- w w <br /> w _cn 0 z _ 0 z J w U)0 J Y _I-o z 0 w w 14 INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. COXX V-6 JULY 2004 <br /> W Z p J w Z _J J W Z J_ Z p W J_ ¢ W Z Z W W v O O <br /> F- J o �` �` '� z w o ¢ �`� o m z O � ci COXX V-7 MARCH 2006 w <br /> O J ¢o 0 _j ¢o - a o 0 w o z IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION MUST BE cn <br /> f- f-f-o f- f- o r f-f-o f- 0 m > 14 14 18 4 5 9 15 CoXX V-8 JULY 2007 <br /> Y (n 0 w z Y 0 OL Z cn 0 a z �`'� p 4 FT. FROM BOTH SIDES AND ENDS (WITH FIBERGLASS TANKS) <br /> z W>> z X>> Ir>> to ? 2 INSIDE 3' TAGE II FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR WET HOLE COXX V-8.1 DEC 2008 <br /> f- ¢ t- TANK STATIC F o ,� ,) 0 0 <br /> x f- x SEE x �`' = PRODUCT LINES 3 INSI FRP 16 INSTALLATIONS ONLY. FABRIC MUST EXTEND TO SLAB AND MAY BE PINNED TO COXX V-9.0 JAN 2010 <br /> Li w GROSYSTEM M.5.3.5 w o 0 Q TO DISPENSERS TO DISPENS SIDE OF HOLE WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. <br /> CL a u' (TYPICAL) <br /> FL > ¢ NO. DATE REVISION DESCRIPTION <br /> 1 <br /> B: TANK INSTAL - PLAN VIEW - BLENDING NOTES <br /> NOT USE ALL PRODUCT, VENT AND VAPOR PIPING 2 11/5/10 ENV. HEALTH COMMENTS <br /> END TO YOUT SHALL BE SIZE OVER SIZE FIBERGLASS \ <br /> SC /4" = 1'-0" PIPING BY SMITH FIBERCAST 3 0 <br /> 4 u <br /> ® NOTES: UST INSTALLATION 5 <br /> 6 <br /> 7 > <br /> 45'-3 1/4" _ Q < NOT USED. 8 <br /> 2'-0°' 41'-3 1/4" 2._0�, Ol SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12 RUN. a <br /> LAYOUT TANKS & STAGE 11 VAPOR RECOVERY PIPING SUCH THAT THE STAGE II s <br /> O FIBER REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT O PIPING DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST W/ 3" <br /> w w z CONCRETE. CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. 0 > <br /> O <br /> 0).:z <br /> a < o I-UJ I- > REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" 10 BALL VALVE ON MANIFOLD LINE TO REMAIN OPEN DURING NORMAL OPERATION. 11 a <br /> J m -i IL o w J z O FROM SURFACE. 2 <br /> ¢ z � a W >0WZ � w �O z <br /> ~ o w _ CE o � w F O 1 1 NOT USED. <br /> 1 V)0 v� w J 0 0 Z J 00 w O REINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" SEAL o <br /> w w z (n W¢X (n w w w Z 4 <br /> a - 0 m Y o o 1- Y c� ¢z p m W IN LENGTH. PLACE REBAR 6" FROM SIDES OF BOX. r / 0 <br /> o Z � J J z ¢IY a.z J J z: z of: 1 TO ABOVE GROUND VENT RISERS, SEE DETAIL ON SHEET G.0.6.2. y� <br /> J O p J J ¢ HX¢W J J ¢¢ x0 p p <br /> cn ? L� L% fn w>> ti f-c� w 0 cn SINGLE 1" CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL-OFF <br /> 44 5 4 4 4 5 4 5 OAT PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER THE <br /> AT SUMP & BUILDING WIRING TROUGH. CONTAINS LINE VOLTAGE WIRING. 1 Q FOOTPRINT OF THE TANKS. REQUIRED TO PROVIDE FOR PROPER TANK HOLD <br /> LAST TWO FEET TO SUMP SHALL BE PVC COATED RIGID. DOWN, AND TO PREVENT ACCIDENTAL DRILLING INTO TANK. m <br /> Erog? Ju i c <br /> iv 16 ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. FOR 14 CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE �.� °- <br /> STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP SENSORS, CORNERS WHERE MEETING CONCRETE. F p <br /> PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL SENSOR ��CAI-®V <br /> LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL-OFFS IN BUILDING & 15 DIESEL OPTION USES JUST ONE PRODUCT LINE TO DIESEL DISPENSER. cm <br /> PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO INTRINSICALLY SAFE <br /> 12,000 10,000 O TROUGH IN BUILDING. CONDUITS SHALL CONTAIN ONLY LOW VOLTAGE <br /> PREMIUM + t i UNLEAD WIRING FOR SENSORS. LAST TWO FEET TO SUMPS SHALL BE PVC 16 REFER TO DIESEL UST INSTALLATION DRAWING FOR STAND-ALONE UST OR AS CONFIDENTIALITY STATEMENT: <br /> AN EXTENSION TO THIS UST DESIGN. <br /> COATED RIGID. THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO, <br /> THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL00 <br /> SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, PLACEMENT, AND BUSINESS INFORMAT ON OF 8P. ACCORDINGLY, THE p <br /> co ORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED BY RECIPIENT AGREES TO RETAIN MESE MATERIALS IN STRICT <br /> ® ® ® _I f ® © ❑ CONFIDENCE AND AGREES NOT TO DISCLOSE THESE I'7 <br /> Q THE LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL LOCATION MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES <br /> o USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN NOT To MAKE COPIES OF THE MATERIALS. THE RECIPIENT �? <br /> „ SIGN-OFF SHALL BE DOCUMENTED. AGRE <br /> -Y4„ ES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> g 6 Z Yg & MAX OF IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. PURPOSE FOR WHICH BP HAS MADE THE MATERIALS <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> 14 14 10 16 1 O ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS & NUMBER OF NTENDEDSPTO BP URPOSE EIOREUPON OTHE O REQUEST OFFBP E <br /> FIELD REPRESENTATIVE. 18 PRODUCT LINES (1 OR 2 PER UST SUMP). WHICHEVER coMEs FIRST. Q) <br /> MANIFOLD <br /> PIPE AND TANK DESIGN DISCLAIMER: 0 <br /> 1 5 6 1 5 6 BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR <br /> 5 PETROLEUM EQUIREMENiS THAT EX ST R EAS THM <br /> 6 ASPHALT AND STONE PER MPLIANT <br /> DEY MAY <br /> BE d <br /> ASPHALT & STONE AS PROJECT SPECIFICATIONS APPLIEFUE ING STORAGE ANDEDELIV DELIVERY SYSTEM CONSTRUCTEDN THE FUTUR . NOR DO S BP WARRANT HATIN <br /> CONFORMITY WITH THESE PLANS WILL BE FREE OF ALL <br /> TO BUILDING SPECIFIED BY PROJECT 14 LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO C} <br /> 0 0 5 5 SPECIFICATIONS EXTEND CONTINUOUS 14 CONSULT WITH A FUELING STATION ENGINEER OF YOUR <br /> I 4 4 (6) 1" CONDUITS CHOOSING TO INDEPENDENTLY EVALUATE W ETHER THESE <br /> FILTER FABRIC TO SLAB PLANS ARE TRULY SUFFICIENT FOR CONSTRUCT NG rHE <br /> 01) 5 15 STORAGE AND DELIVERY SYSTEM AT YOUR STATION. <br /> N 5 16 SIPHO AR 5 14 4 4 5 8 5 6 ._.•,.. _ +•:. DEVELOPMENT INFORMATION: w <br /> A 4. E <br /> UNDERGROUND STORAGE 0 <br /> 2t ��• UNl <br /> a <br /> TANK STANDARDS <br /> ELEMENT TP01 <br /> 8 6 4 5 <br /> NOTE: 1 \/\ _ 16 FILTER FABRIC \\/ <br /> 1 <br /> Q \// // / V-9.0 2010 SERIES <br /> /'- . • 16 1 SLOPE SIDES OF TANK HOLE /\ GENERAL SHEETS DESIGN INTENT <br /> OR USE SHORING FOR ALL 15 15 // / 0 <br /> TANK EXCAVATIONS IN \/ / 0 <br /> CEO <br /> o 14 14 ACCORDANCE WITH OSHA 1926 \\ \ 2 10 -6 3 0 10 -6 2 \\�/ SITE ADDRESS: Ln <br /> SUBPART P, OSHA STANDARDS /\ \/ <br /> 4 5 TANK SLAB - EXCAVATIONS; FINAL RULE /\\\ MIN. MIN. <br /> f <br /> 1 2 3 4 OCTOBER 1, 1989 <br /> i -- 7 8 1 \//\\ /\\/ 3rd LIFT OF <br /> PEA GRAVEL00 <br /> 5 16 \/\\\ — / 0 <br /> 0o TO TOP OF '� <br /> 0 "913 \\\ j\\j/ TANK > <br /> / w <br /> N 14 5 5 4 5 4 5 14 \/// \\//\ DESIGNED BY SHK/OV AWANCE Z&DM: DB cf) <br /> " " O o x \\ \/ 2nd LIFT OF PEA GRAVEL CHEO(ED BY:5 -9 3/4 37 -5 1/2 SHK10V BP REPM: DB o <br /> 1Q <br /> ° 1st LIFT OF PEA GRAVEL DRAWN BY: OV ALLIANCE PM: DB w <br /> N. ° °° ° ° ° °�°°°° 1°-Q4r MIN°° °° ° \/ N BED VERSION: PROJECT NO: L0 <br /> J� w; - fYI—z 01-0 =-- Z w o o ° V-9.0 <br /> ¢O J ZU' woz 0 Y 0 zg J J C1 <br /> J >> Lu ° <br /> F-t: O w 0f—a F L== ¢wm ¢ z cn mo V) o <br /> w J Z W ¢ / / /\ \/\ \ \ \ " \ \ \/\ \/ /\ L_ <br /> O J J(,0 Q U> LU J J C7 Z H j 0„ MIN. 10 12 DRAWING TITLE: <br /> w J ¢ z �'pf_w Z m O ¢ Q g 2 3 4 5 6 FILTER FABRIC ON 6 MAX. 18 UST INSTALLATION J <br /> o ¢ J x 0 o TANK STATIC U= Q o 1 100 20K& 1 10012K/10K 1-1 <br /> 0 <br /> z w ~ o ¢ MSE 5 GROUNDING 0 0 0 s 4' 4 15 18 14 15 1 a BOTTOM <br /> HOLE 16 18 18 11 ( � � � 0 <br /> o�W SYSTEM N[> a a 2' INSIDE 3 STAGE II ( BLENDING <br /> z PRODUCT LINES 3" INSIDE 4" FRP HOLE ONLY) 1'-0" MIN. PEA GRAVEL 0- <br /> ¢ 7 DOUBLE WALL VENT&VAPOR <br /> w 0 TO DISPENSERS TO DISPENSERS ❑_ <br /> > >`' O INSTALLED OVER COMPACTED SOIL. <br /> o w (TYPICAL) IN WET HOLE NOTE_ NOTE: m <br /> INSTALLATIONS, <br /> ALTERNATE ANCHORING BY USE OF DEFLECTION MEASUREMENT BEFORE & AFTER <br /> 2 A CONCRETE ANCHORING PAD IS TANK INSTALLATION SHALL BE ACCORDING TO INCREASE TO 18" MINIMUM PER SHEET N0: <br /> PERMITTED. CONSULT WITH MANUFACTURER'S REQUIREMENTS AND SHALL MANUFACTURER'S RECOMMENDED <br /> OWNER'S REPRESENTATIVE AND BE WITHIN MANUFACTURER'S TOLERANCES. INSTALLATION GUIDELINES. cn <br /> SUCH SHALL BE INSTALLED ALL INFORMATION SHALL BE COMPLETED AS <br /> NOT <br /> ACCORDING TO MANUFACTURER'S PER THE MANUFACTURER'S WARRANTY o <br /> A' T INSTALLATION - PLAN VIEW - BLENDING RECOMMENDATION. DOCUMENTATION. <br /> USE WHERE DIFFERENT SIZED TANKS ALL PRODUCT, VENT AND VAPOR PIPING M ,5,3,08 <br /> A,WACENT LAYOUT ARE USED, ALIGN THE FILL PORTS SHALL BE SIZE OVER SIZE FIBERGLASS 0 TYPICAL TANK ANCHORING DETAILNOTE: INDICATES ITEMS FOUND ON MATERIALS <br /> ALE: 1/4" = 1'-0" TO FACILITATE TANKER DELIVERIES PIPING BY SMITH FIBERCAST SCALE: 1/4" = 1'-O" XX LIST SHEETS M.5.3.01 & M.5.3.02 J <br /> i� <br />