Laserfiche WebLink
CLIENT: <br /> p <br /> S . . <br /> 28 <br /> 22 26 Leak Detection system Notes <br /> MSI ALLIES EC PUMP <br /> DISP <br /> POS AND[ BOX # 1 MONITOR SENSOR & PROBE WIRING IS INTRINSICALLY SAFE WIRING AND MUST BE SEPARATE \\ <br /> BOX I (SERIAL RS-485) DISP FROM ALL OTHER WIRING AND INSTALLED IN SEPARATE CONDUIT. MAXIMUM CABLE LENGTH <br /> TLS-350 <br /> 26 PIB #2 BETWEEN MONITOR CONSOLE AND SENSORS IS 1,000 FEET. <br /> I 2. CAUTION: GLOBAL FUELS TECHNOLOGY <br /> ! 20 o %DISP 120 VAC WIRING MUST NOT BE CONNECTED TO LOW VOLTAGE CONNECTIONS. DAMAGE FROM 150 W ILLINOIS <br /> ROAD <br /> I (PUMP INTERFACE BOARD) NAPERVILLE, IWNOIS 605638473 <br /> MISWIRING FROM MISWIRING IS NOT COVERED BY WARRANTY. INSTALLING CONTRACTOR TO BE <br /> NATIONAL SITE ADAPT CONSULTANT. <br /> HELD RESPONSIBLE. <br /> J-BOX MSM CAT 7 DISP <br /> OR #4 3. INSTALL TANK MONITOR SYSTEM PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> DEBIT <br /> CAT <br /> i <br /> INTERFACE RS-485 4. USE BELDEN CABLE # 88760 OR APPROVED EQUAL FOR ALL SENSOR AND PROBE WIRING. <br /> SAM RS-485 PIC 5. RUN RIGID METAL CONDUIT FOR PROBE AND SENSOR WIRING FROM THE MONITOR CONSOLE <br /> DEBIT TO THE INTRINSICALLY SAFE WIREWAY. CONDUIT MUST ENTER THE MONITOR WHERE <br /> KNOCKOUTS ARE PROVIDED. NO OTHER CONDUIT ENTRY IS PERMITTED. <br /> CONDUIT 27 6. SPECIAL NOTE: IT IS THE INTENT OF THIS DESIGN THAT ANY DETECTED LEAK OR ANY FAILURE ����®�' '� ���� ��® <br /> SHARED C <br /> DISP (CAT 5 & OF THE LEAK DETECTION SYSTEM, WILL RESULT IN THE INTERRUPTION OF ALL POWER TO THE <br /> CAT 5 #1 INTERCOM) TO EACH PRODUCT PUMPS. �74� SIERRA '.. 44117E J <br /> C) <br /> DISPENSER _ GRE REQUIREMENTS SHALL BE MET BY DUBLIN, CA. s45ss <br /> MIS (TYPICAL) 7. CERTIFIED INSTALLERS ALL MANUFACTURERS TRAINING Q (925j 561-7555 <br /> ~ CONTRACTOR INSTALLING PROBES AND WIRING TO MONITORING SYSTEM AS BEINGS DISPENSER <br /> INTERCOM <br /> WIRING. <br /> (BELDEN CABLE X720) z DISP MASTER DRAWING RELEASE HIS <br /> � #3 8. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO NOTIFY THE VEEDER ROOT VERSION DATE <br /> DISTRIBUTOR FOR STARTUP. <br /> COXx V-0 MAY 2000 <br /> 9. SEE MANUFACTURERS WIRING DIAGRAM FOR SPECIFIC WIRING AND FURTHER INFORMATION. <br /> WIRE THE EQUIPMENT AS REQUIRED BY THE MANUFACTURERS WIRING DIAGRAM. COXV-1 FEB 20 <br /> COXX <br /> V-2 JUNE 2001 <br /> 10. EACH TURBINE RELAY IS TO BE WIRED INTO THE MONITOR CONTROL SO THAT AN ACTIVATION Coxx v-3 JAN 2002 <br /> OF TURBINE SIDE SUMP PROBE OR ANNULAR SPACE PROBE WILL SHUT DOWN THE TURBINE Coxx V-4 JUNE 2002 <br /> CoxX v-5 FEB 2003 <br /> FOR THAT TANK. <br /> COXX V-6 JULY 2004 <br /> F <br /> I e T O MSI POS COXX V-7 MARCH 2006 X <br /> ARCO WAYNE NON <br /> COXX V-8 JULY 2007 <br /> e COXX V-8.1 DEC 2008 <br /> COXX V-9.0 JAN 2010 <br /> SCALE: NTS U <br /> NO. I DATE REVISION DESCRIPTION <br /> � II <br /> 2 <br /> 6 <br /> 3 <br /> U <br /> 4 <br /> 5 Il <br /> 6 0 <br /> cV <br /> 7 O <br /> 8 O <br /> ® I CI e IST-VFC NOTES VEEDER-ROOT TLS-350 NOTES s <br /> CAT Cable Installation Gu <br /> O o <br /> -� E <br /> REQUIREMENTS FOR THIS SYSTEM: At <br /> IWARNING:1 IN INSTALLATION AND USE OF THIS PRODUCT, � <br /> 1. EXCESSIVE FORCE SHOULD NOT BE USED TO PULL IN NEW CABLE. PULL FORCE SHOULD NOT EXCEED COMPLY WITH THE NATIONAL ELECTRICAL CODE: FEDERAL, <br /> 1. TWO OR MORE VFC CONTROL BOXES WITH REVISION 1.5 SOFTWARE (SEE FIGURE 2). PLEASE SEAL <br /> 25 LBS. STATE AND LOCAL CODES. IN ADDITION, TURN OFF POWER �;, � o <br /> CONTACT FE PETRO FOR AVAILABILITY. AND TAKE OTHER NECESSARY PRECAUTIONS DURING A <br /> 2. CABLE SHALL NOT BE KINKED, KNOTTED, OR OTHERWISE DEFORMED DURING INSTALLATION. 2. VEEDER-ROOT TLS-350 WITH VERSION 27 TLS SOFTWARE. PLEASE CONTACT VEEDER-ROOT FOR INSTALLATION, SERVICE AND REPAIR TO PREVENT PERSONAL ' <br /> rn <br /> AVAILABILITY. INJURY, PROPERTY LOSS AND EQUIPMENT DAMAGE. SNr R k933 �� -n <br /> 3. PROPER CABLE SUPPORT HARDWARE SUCH AS J-HOOKS SHALL BE USED TO PREVENT RIPPING OR In <br /> 3. SET THE VFC WITH THE PLLD TRANSDUCER INSTALLED IN ITS PUMP TO BE THE MASTER VFC. <br /> FRAYING OF CABLE. WHERE USED, STAPLES SHALL BE NON-METALLIC PLASTIC. STAPLE SHOULD BE `� ".03/31/11 o <br /> NOT CRIMPED. 4. 18 AWG 3-WIRE SHIELDED COMMUNICATION CABLE (300 V MINIMUM) CONNECTING VFCS. ® WARNING: DISCONNECT ALL POWER BEFORE MAKING AN z <br /> ENOUGH SUCH THAT CABLE JACKET IS 5. AN FE PETRO MODEL 65 PSI CHECK VALVE OR A NON-VENTED CHECK VALVE SHALL BE z <br /> LOOSE CONNECTIONS TO PREVENT DEATH, SERIOUS INJURY, <br /> SECURED FITTING WIRE TIE OR VELCRO TIE WRAPS. CABLES INSTALLED ON THE SLAVE PUMPS (IF USED). - EXPLOSION OR ELECTRICAL SHOCK. MONITOR MUST NEVER BE pew o <br /> I 4. CABLE BUNDLES MAY BE �ECURED WITH LOOSE F <br /> I, SHALL NOT BE OVER TIGHTENED SUCH THAT CRUSH STRESS IS EVIDENT. 6. WIRE VFC CONTROLLERS ACCORDING TO FIGURE 3 OF FE PETRO TECHNICAL BULLETIN TB 015, OPERATED UNLESS THE FRONT COVER IS CLOSED OVER THE C1PC ALFIr <br /> DATED JUNE 12, 2001. BARRIER TERMINALS IN THE INTRINSICALLY SAFE AREA. <br /> I <br /> ROUTED TO PERMIT SWEEPING BENDS, NOT RIGHT ANGLES OR SHARP BENDS. CABLE 7. INSTALLATION MANUALS FOR BOTH VEEDER-ROOT TLS-350 & FE PETRO VFC WILL BE AVAILABLE <br /> h 5. CABLE SHALL BE ROU <br /> RUNS SHALL BE INDIVIDUALLY SUPPORTED. DURING INSTALLATION. <br /> NOTES: � <br /> L'ONFlDENTIA_I IITY STATEMENM <br /> 6. A MINIMUM OF CABLE JACKET SHALL BE REMOVED WHEN TERMINATING. CABLE JACKET SHALL EXTEND BASIC OPERATION FOR THIS CONFIGURATION: THE RECIPIRIGHT IN H THESE MATERIALS UNDERSTANDS THAT I <br /> AS CLOSE AS PRACTICAL TO THE TERMINATION POINT, LEAVING NO MORE THAN 3�4 INCH OF WIRE 1. WIRING TO PROBES, SENSORS, & PLLD MUST BE SHIELDED MULTI-STRAND, GAS AND COPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO. <br /> r THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL O <br /> EXPOSED. 1. THE VEEDER-ROOT TLS-350 SYSTEM MONITOR THE TANK PRODUCT LEVELS. OIL RESISTANT SIZES FROM AWG #18 TO AWG #14. BARRIER GROUND WIRING MUST BE BUSINESS INFORMATION OF BP. ACCORDINGLY, THE r7 <br /> 2. WHEN DEMAND FOR PRODUCT IS CALLED FOR, A 120 VAC HOOK SIGNAL FROM DISPENSER IS <br /> RECIPIENT AGREES TO RETAIN THESE MATERIALS IN STRICT <br /> AWG #12 OR LARGER. CONFIDENCE AND AGREES NOT TO DISCLOSE THESE <br /> PRESENT, THE VEEDER-ROOT TLS-350 SYSTEM WILL TURN ON A PUMP ACCORDING TO THE PRODUCT MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES <br /> 7. MAINTAIN TWISTED CONFIGURATION OF WIRE PAIRS TO WITHIN 1/2 INCH OF THE TERMINATION POINT. NOT TO MAKE COPIES OF THE MATERIALS THE RECIPIENT <br /> i LEVEL IN THE TANKS, DICTATED BY CONSOLE CONFIGURATION. AGREES TO USE THE MATERIALS ONLY FOR RN LIMITED <br /> 2. CONNECT WITH #12 AWG (OR LARGER) CONDUCTOR THE BARRIER GROUND TO THE PURPOSE FOR WHICH BP HAS MADE THE MATERIALS <br /> 3. WHEN DEMAND FOR PRODUCT RISES, MORE PEOPLE DISPENSING PRODUCT, WHICHEVER VFC IS IN AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> EARTH GROUND BUS AT THE POWER DISTRIBUTION PANEL. MATERIALS UR O OTHER UPON COMPLETION F THE <br /> INTENDED PURPOSE OR UPaJ THE REQUEST OF�', N <br /> 8. WIRES SHALL NOT BE SPLICED. DAMAGED CABLE SHALL BE REPLACED, NOT REPAIRED. THE LEAD POSITION CAN CALL FOR ADDITIONAL VFC TO TURN ON. WHICHEVER COMES FIRST. <br /> 4. WHEN THE DEMAND FOR PRODUCT GOES AWAY, THE VEEDER-ROOT SYSTEM WILL PERFORM A LINE 3. QQ DENOTES FIELD WIRING CONNECTION USING WATERPROOF CONNECTORS SUPPLIED PIPE AND TANK�1FSIrN DISCL4IMER: v <br /> RE AT OUTLET AND CONNECTION POINT. LEAK TEST USING THE VFC DESIGNATED AS THE MASTER ACCORDING TO VEEDER-ROOT'S LINE TEST WITH THE PROBE(S) AND SENSOR(S). BP DOES NOT AND CANNOT DISPENSWARRANING <br /> THAT THE PLANS FOR / <br /> 9. LEAVE APPROXIMATELY 18 INCHES OF SPARE WI PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH rn <br /> PROTOCOL. ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE 01 <br /> APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A C <br /> FUE <br /> 10. ENSURE ADEQUATE SEPARATION WHEN RUNNING CAT 5 CABLE PARALLEL TO POWER WIRING. CABLE 5. IN THIS CONFIGURATION, IF THERE ARE ANY FAULTS IN THE SYSTEM THE WHOLE SYSTEM WILL BE 4. INTRINSICALLY SAFE WIRING SHALL BE INSTALLED IN ACCORDANCE WITH ARTICLE LEAKS. STORAGE AND DELIVERY SYSTEM CONSTRUCTED T 3 <br /> CONFORMITY WITH THESE PLANS WILL BE FREE TR ALL O <br /> SHALL NOT BE ROUTED THROUGH SAME BORE HOLES AS POWER WIRING. WHERE POSSIBLE CAT 5 SHUT DOWN. 504-20 OF THE NEC ANS/NFPA 70, 1990. LEAKS You ARE ACCORDINGLY STRONGLY ENCOURAGED TO <br /> CONSULT WITH A FUELING STATION ENGINEER OF YOUR <br /> LES SHOULD CROSS POWER WIRES AT 90 DEGREE ANGLES. MAINTAIN SEPARATION BETWEEN CABLE CHOOSING N INDEPENDENTLY EVALUATE WHETHER THESE <br /> CAB WIRING DIAGRAM IN FIGURE 1 SHOW THE CONNECTIONS THE VEEDER-ROOT POWER R Y PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> THE 5. TO MAINTAIN INTRINSIC SAFETY AND PROPER SYSTEM OPERATION, PROBE AND STORAGE AND DELIVERY SYSTEM AT YOUR STATION. <br /> AND OTHER WIRING AS FOLLOWS: DEVELOPMENT INFORMATION: <br /> CONSOLE AND THE MASTERZSLAVE VFCS. SENSOR WIRING MUST BE INSTALLED WITHIN SEALED CONDUIT. <br /> 4 <br /> 1. FOLLOW ALL SAFETY AND INSTALLATION INSTRUCTIONS IN THE VEEDER-ROOT SITE PREP AND 6. ELECTRICAL RATING POWER INPUT - 120VAC, 50/60 HZ, 600 WATTS MAX. UNDERGROUND STORAGE o <br /> INSTALLATION INSTRUCTIONS FOR THE VEEDER-ROOT TLS-350. TANK STANDARDS <br /> PURPOSE TYPE OF WIRE MIN. SEPARATION 2. FOLLOW ALL SAFETY AND INSTALLATION INSTRUCTIONS IN THE IST-VFC INSTALLATION AND OWNERSL <br /> MANUAL FOR WIRING NOT SHOWN IN FIGURE 1. 7. REFER TO "SITE PREPARATION AND INSTALLATION INSTRUCTIONS," MANUAL N0. ELEMENT TP01 r <br /> 576013-622 FOR ACTUAL LOCATION OF CONDUIT ENTRY INTO TLS-350 MONITOR. <br /> � <br /> OPEN WIRING LESS THAN 300 VOLTS 2 INCHES <br /> 3. SET SW3 SWITCHES ACCORDING TO MASTER-SLAVE CONFIGURATION NOT FOR MASTER-SLAVE V-9.0 2010 SERIES <br /> POWER SUPPLY WIRE IN CONDUIT OR ARMORED OR ALTERNATING CIRCUIT (M-S/AC). IF VFCS ARE SET IN M-S/AC THE PUMPS WILL NOT TURN ON IN A 8. REFER TO LINE LEAK DETECTOR "SITE PREPARATION AND INSTALLATION," MANUAL NO. CALIFORNIA MARKET <br /> NON-METALLIC SHEATH CABLE/POWER NONE PREDICTABLE MANNER. 576013-764. O <br /> 4. CALIBRATE CONTROLLERS ACCORDING TO CALIBRATION INSTRUCTIONS IN IST-VFC INSTALLATION AND O <br /> I <br /> GROUND WIRES OWNERS MANUAL <br /> 9. RS-232 MODULE IS LOCATED IN THE COMMUNICATIONS COMPARTMENT AND MUST BE �� ' E�` <br /> 0 <br /> ANTENNA LEAD & GROUND WIRES ORDERED SEPARATELY. <br /> RADIO & TELEVISION 4 INCHES ADDITIONAL NOTES: <br /> WITHOUT GROUNDED SHIELD <br /> 10. BONDING LOCKNUTS AND. OR BONDING BUSHINGS SHALL BE USED AT ALL CONDUIT � <br /> SIGNAL & CONTROL WIRE OPEN WIRING NOT OVER 300 VOLTS NONE 1. FOR ADDITIONAL INFORMATION, REFERENCE VEEDER-ROOT SITE PREPARATION AND INSTALLATION ENTRANCES TO THE TLS-350R ENCLOSURE AND AT ANY JUNCTION BOX/WIRING TROUGHS co <br /> O <br /> MANUAL 576013-902 FOR INSTALLATION INSTRUCTIONS OF PLLD USING AMASTER/SLAVE <br /> IN THE NON-HAZARDOUS AREA TO ENSURE POSITIVE CONDUIT GROUNDING, 0 <br /> COMMUNITY TELEVISION SYSTEMS CONFIGURATION. <br /> CAN CABLES COAXIAL CABLES WITH GROUNDED NONE 2. A NON-VENTED CHECK VALVE, VEEDER-ROOT PART NUMBER VR-330020-416, OR FE PETRO 11. SOFTWARE ENHANCEMENT MODULE REQUIRED (#330160-012) AND MUST BE <br /> SHIELD MODEL 65-PSI CHECK VALVE MUST BE INSTALLED ON THE SLAVE TANK TURBINE TO ENSURE PROPER ORDERED SEPARATELY. Lu <br /> OPERATION OF SYSTEM AND PROVIDE ADEQUATE LINE LEAK PROTECTION. SEE FE PETRO TECHNICAL oE�c;rlEo a SHIUO BPAWANCE <br /> REPM z ®B cD <br /> SERVICE SERVICE BULLETIN TB-015, DATED JUNE 12, 2001, FOR MORE SPECIFIC DETAILS. 12. FOR 2 PUMPS IN SINGLE TANK OPERATION, PUMP SENSE MODULE REQUIRED 0 <br /> TELEPHONE SERVICE 2 INCHES (#847490-204) AND MUST BE ORDERED SEPARATELY. IF USING PLLD, PUMP SENSE OHEa®� SHK/O A ' DB o <br /> AERIAL OR BURIED - J <br /> DROP WIRE 3. THE VEEDER ROOT TLS-350 SYSTEM MUST BE PROGRAMMED USING THE CORRECT DISPENSER ( oRAwN BY. ��� In <br /> MODULE IS NOT REQUIRED ELECTRONIC LINE LEAK DETECTOR IS DOING THE PUMP GRSIO DB <br /> MODE. THE PROGRAMMER MUST SELECT THE MANIFOLDED ALTERNATE MODE IN THE PLLD SET-UP SENSE). VERSION: PRMCT Na OD <br /> OD <br /> k NEON SIGNS AND ASSOCIATED WIRING �/-9.0 <br /> SIGN FROM TRANSFORMER 6 INCHES SECTION. SEE VEEDER-ROOT SYSTEM SET-UP MANUAL 576013-623 FOR SPECIFIC PROGRAMMING <br /> INSTRUCTIONS. 13. NO SPLICING OF PROBE/SENSOR WIRE EXCEPT AT THE DEVICE ITSELF. 01/04/2010 1-0 <br /> - <br /> SIGN <br /> TITLE: o <br /> { 4. THE VEEDER-ROOT TLS-350 MUST BE PROGRAMMED USING THE MANIFOLDED TANK SET-UP. THE 14. CONTRACTOR MUST COMPLY WITH ALL THE TRAINING REQUIREMENTS OF IST-IFC,CAT 5 <br /> 1-1 <br /> FLUORESCENT LIGHTING FLUORESCENT LIGHTING WIRE 5 INCHES J <br /> PROGRAMMER MUST ASSIGN THE MASTER TANK T-1 TO LINE LEAK DETECTOR Q-1. THE SLAVE TANK VEEDER-ROOT. &VEEDER•ROOT 0 <br /> T-2 TO LINE LEAK DETECTOR Q-2. SPECIFIC PROGRAMMING QUESTIONS SHOULD BE DIRECTED TO � <br /> LIGHTNING SYSTEM LIGHTNING RODS AND WIRES 6 FEET VEEDER-ROOT TECHNICAL SUPPORT DEPARTMENT BY CALLING 800-323-1799. 15. SPECIFIC PROGRAMMING FOR VEEDER ROOT TLS-350 CONSOLE SHALL BE OBTAINED NOTES Q <br /> FROM THE LOCAL ENVIRONMENTAL COMPLIANCE MANAGER. <br /> m <br /> 0 <br /> SHEET NO: c <br /> G> <br /> U <br /> N <br /> I <br /> U <br /> N <br /> 0 <br /> OTE: <br /> CL <br /> NINDICATES ITEMS FOUND ON Mm5m3m3O <br /> XX MATERIALS LIST SHEETS M.5.3.01 & M.5.3.02 <br /> gi <br /> I.L <br /> I <br /> I <br /> r <br />