My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATED IN MGR OFFICE LOCATED IN MGR OFFICE CLIENT: <br /> SECTION 1A <br /> SECTION 1A bP <br /> TERMINAL BLOCK WITHIN <br /> ISOLATED GROUND C T <br /> ® CPI PETRO PANEL. SEE <br /> FP DETAIL E THIS SHEET B u BAR FOR ALL OTHER Carolina iwe. <br /> 120V FOR MPD CONTACTOR - <br /> COIL VOLTAGE WHICH IS 0 MPD CONTACTORS UREQUIRED ISOLATED <br /> ROUTED THROUGH <br /> EMERGENCY STOP RELAY MPD MAINTINACE GROUND CIRCUITS <br /> SWITCH MOUNTED ON �: MPmD z MP®D a MPOm, MPmD s GLOBAL FUELS TECHNOLOGY <br /> °cb 150 WARRENVILLE ROAD <br /> 0 FRONT OF CABINET 1A � 6 PANEL <br /> . o G ° NAPERVILLE, ILLINOIS 60563-6473 <br /> FACTORY WRING <br /> � � <br /> oONATIONAL SITE ADAPT CONSULTANT: <br /> � I" LLE4:)a <br /> °�' -11:1110 <br /> FACTORY INSTALLED MPD �: a PD e aclo 41x <br /> TO TERMINAL aoa °'b' "�° <br /> CONTACTOR (TYP) BLOCK a": •o �• �� <br /> �•- -� <br /> v' 'a° ocb ..� LJ <br /> TERMINAL BLOCK WITHIN ® (PANEL G �- - <br /> - •� <br /> p CPI PETRO PANEL. SEE �. .olo ° <br /> DETAIL E THIS SHEET moo <br /> NEUTRAL) C SUBMERSIBLE m m = =1130 <br /> FUELING PANEL "G" <br /> �•- -•ap <br /> e,a PUMP CONTACTORS <br /> MPD CONTACTORS ARE FACTORY WIRING --' O1tt0®r - Ryan Inc. <br /> PD SWN <br /> PANEL G 6747 SIERRA CT. SUITE J 1 <br /> PREWIRED BY C P 1 208Y 12ov DUBLIN, �A. 94566 I <br /> --TERMINAL BLOCK WITHIN PANEL G 1 <br /> CPI PETRO PANEL. SEE / ESO RELAY (925) 551-7555 1 <br /> DETAIL E THIS SHEET 100A MLO 208Y/120V <br /> 100A MLO SUBMERSIBLE X <br /> FIELD INSTALLED MASTER DRAWING RELEASE HISTORY m <br /> -OWER WIRING To F PUMP PILOT ° <br /> DISPENSER (TYP.) VERSIONI DATE <br /> LIGHTS <br /> M.5.3.33 Coxx V-0 MAY 2000 <br /> NTACTORS SC TIC ETAIL �. �. <br /> B : MPD I COXX V-1 FEB 2001 <br /> r NOT TO SCALE: ! Coxx V-2 JUNE 2001 _ <br /> COXX V-3 JAN 2002 11 <br /> VFC • • __ <br /> I COXX V--4 JUNE 2002 <br /> I I Coxx V-5 FEB 2003 <br /> 7O C I° <br /> TERMINAL BLOCK WITHIN ELECTRONIC ' AlEMERGENCY MPD MAi �TENANC E coxX V- JULY 2004 <br /> CPI PETRO PANEL. SEE <br /> COXX V-7 MARCH 2006 <br /> DETAIL E THIS SHEETD DISPENSER POWER ,, „ FUELING STOP SWITCHES AND <br /> COXX V-8 JULY 2007 <br /> ISOLATION RELAYS IST CONTROLLERS _ _ _ _ _ _ _ _ _ EMERGENCY BYPASS Coxx v-8.1 DEC 2008 <br /> e o LOCATED BEHIND r I SWITCHES FOR Coxx v-s.o JAN 2010 N <br /> oo• •oo <br /> 120V FOR SUBMERSIBLE —►FP �: :� ACCESS DOOR SEE DETAIL C THIS <br /> SHEET AND SCHEMATIC I FUELING AND <br /> PUMP CONTACTOR COIL e FACTORY WIRING �: :o I I LIGHTING LOCATED NO. DATE REVISION DESCRIPTION (714 <br /> VOLTAGE WHICH IS 0"; •® WIRING DIAGRAM ON I I ° <br /> ROUTED THROUGH TO TERMINAL ,o, ,o„ <br /> EMERGENCY STOP BLOCK ®; ;� IST IST SHEET M.5.3.32 I I BEHIND ACCESS o <br /> RELAY GN nck •1:)Io I DOOR <br /> (PANEL G � o� OR OR s <br /> - - - - - - - - - J Q> <br /> FACTORY WIRING NEUTRAL) w. •� MAG MAG 3 <br /> acl; VFC VFC 4 <br /> F A LED ELECTRONIC DISPENSER o <br /> SUBMERSIBLE PUMP a 0 POWER ISOLATION RELAYS 0 6 3 <br /> CONTACTOR COIL 1 1A PANEL G — LOCATED BEHIND ACCESS 7 ° <br /> TO Rs BOX 208Y/12ov DEDICATED ISOLATED GROUND DOOR 8 - <br /> LOAD 100A MLO TERMINAL <br /> BAR FOR VFC'S GROUNDING o <br /> TERMINAL #1 E BLOCKS FOR <br /> SEE DETAIL D IIIi ..I .Ii�Iii ..I ��I .I, I. CONNECTION. MUST BE 9 <br /> cr C <br /> SUBMERSIBLE PUMP THIS SHEET <br /> MPD POWER ! III ! ( ! I _...... CONNECTED TO MAIN SERVICE ■F <br /> CONTACTORS ARE PREWIRED & CONTROLS <br /> GROUND BY INSTALLING ° <br /> BY CPI H�� 42" CONTRACTOR �,� 0 <br /> slcukTURBINE VARIBLE <br /> SPEED ELEVATION VIEW DOOR CLOSED ® A�c <br /> UFC CONTROLLER <br /> PREINSTALLED ELEVATION VIEW DOOR OPEN ����� <br /> FACTORY W"RING #1 REINS `U r✓�F �� � <br /> WITHIN CPI PETRO o <br /> PANEL NOT TO SCALE: = 42 - 33 N D_ <br /> NOTES: 3/31/11 <br /> 39 0 <br /> 3„ s h <br /> FIELD INSTALLED 1. ALL DOORS HAVE LIFT OFF HINGES. 4 �F v <br /> � CAS- ® v <br /> POWER WIRING TO 2. ALL PANELBOARDS ARE CLEARLY LABELED WITH PANEL NAME TAG. <br /> UNLEADED PUMP 1 3. ALL PANELBOARDS HAVE COMPUTER GENERATED CIRCUIT DIRECTORY CARDS LOCATED ADJACENT TO EACH PANEL. w <br /> MOTOR TYP. 4. ALL FEEDERS TO PANELBOARDS LOCATED WITHIN SYSTEM ARE FACTORY WIRED AS SPECIFIED. �.E RECIPIENT Tl-i T OF Tv�r T: <br /> k » '""�`f= THE REgP1ETJT OF THESE MATERIALS UNDERSTANDS THAT I <br /> I COPYRIGHT IN THE MATERIALS IS OWNED BY BP. AND ALSO. <br /> 5. ALL CONTROLLED LIGHTING LOADS ARE FACTORY WIRED FROM CIRCUIT BREAKER TO LINE SIDE OF CONTACTOR. REFER TO 1 „ THAT THE MATERIALS corlTAiN PR NI�f ED AND CONFIDENTIAL � <br /> C. SUBMERSIBLE PUMP CONTACTORS SCHEMATIC DETAIL MANUFACTURERS SHOP DRAWINGS FOR ADDITIONAL INFORMATION. 5 SECTION 1 A STUB UP AREA <br /> BUSINESS INFORMATION °F Imo. ESE MATERIALS <br /> THE <br /> I COMMRECIPIENT AGREES GR ESRETAINNO THESE MATERIALS S STRICT <br /> COliF!GE?iCE AND AGREES NOT TO DISCLOSE THESE P+') <br /> 6. ALL CONTROLLED FUEL SYSTEM LOADS ARE FACTORY WIRED FROM CIRCUIT BREAKER TO LINE SIDE OF CONTACTOR. NOT TO TF]iI MM �AKEE ANY OTHER PARTY AND FURTHER AGREES <br /> NOCOMES OF THE MATERIALS THE RECIPIENT <br /> AGREES TO LKSE THE MATERIALS ONLY FOR THE LIMITED g <br /> NOT TO SCALE: REFER TO MANUFACTURERS SHOP DRAWINGS FOR ADDITIONAL INFORMATION. PURPOSE FOR WHICH RP HAS MADE THE MATERIALS <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> MATERIALS TO SP EITHER UPON COMPLETION OF THE � <br /> INTENDED PURPOSE R UPON THE REOUEST OF R. <br /> WHICHEVER COMES FIRST. <br /> L <br /> ELECTRONIC DISPENSER POWER ISOLATION RELAYS PIPE AND TANK DESIGN DISCLAIMER: 0 <br /> ALL LEGABp DOES L REQUIREMENTS THAT EXIST OOT AND CANNOT WARRANT RT THE PLANS FOR <br /> AS THEY MAY BE LT <br /> * REFER TO DIP SWITCH CHART FOR ACTUAL SETTINGS * V PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH co <br /> INPUT DIP SWITCHM INPUT DIP SWRCHES INPUT DIP SWR*IES INPUT DIP SWD'CHES R S B 0/\ DETAIL APPLIED IN THE FUTURE. NR DOES BP WARRANT THAT A 1: <br /> ,aab�bvaa .baaababo .aaaa�vab oasabaaa <br /> A FUEL E L SYSTEM PANEL PLAN & ELEVATIONS PLAN VIEW FUELING STRATH AND DELIVERY SYSTEM CONSTRUCTED IN 3 <br /> e scmo-o oo '0000v000 '��000vo� •-o-0000- CEAKS. YOU <br /> WITH THESE PLANS WILL BE FREE OF ALL <br /> +--o---oo • •-- --000-oo l7 <br /> va uvoo oo -oo oo ooa •opo oo ovo 0000---o L <br /> ------ :---9-- <br /> 00 _ (PREWIRED BY CPI) CONSULT WITH A FUELING STATER ENGINEER H YOUR TO ..� <br /> O N 0 T T 0 SCALE: CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE / <br /> i as av0000 i oa000 000 r ao�o v0000 •00000000 � PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> Joao----- ---- oov �000 oovv- Www----- I�4 ANP STORAGE AND DELIVERY SYSTEM AT YOUR STATION. <br /> wwwww ww rriwrarw rrvrr�rr `rarwrrrw IID Lm LD)LED IID LID LED LEU FUSE <br /> ❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑❑ i i i i 0 s 0 13 DEVELOPMENT INFORMATION: N <br /> L��D�D�D I �D�D�D tED LED IED lFD lFD 1ED LE9 IED UD LID LPD LED LPD LFO LED LFD �D�D�D�O L�L,m�D I� INTERNAL FACTORY WIRING INTERNAL FACTORY WIRING E <br /> 1 2 3 4 5 6 7 8 1 2 5 43 0 7 6 1 2 3 4 5 6 7 8 1 2 3 4 6 E 7 8 N <br /> UNDERGROUND STORAGE <br /> A A A A A � TANK STANDARDS <br /> . . . . . . . . <br /> OFF R B o R B B B " B o B w M s ELEMENT LINE FACTORY WIRING TO D_ D. <br /> BCDEFGHJ BCDEFGHJ BCDEFGHJ BCDEFGHJ 12345678 <br /> Ll ` D: �' <br /> TERMINAL BLOCK FP " N "� "� t Y to zd n M 00 W z to z N z0 zz V-9.02010 SERIES <br /> J a' z c m J 0_' D.' z Ix O Inn O <br /> 0: w m z D: w o H m 0: M o o z M D. m D. z w .1 m D: ro m 0 I- m or D: o c0 m o m o <br /> QQQQ�QQQ ��Q � T �� T �QQ000© ©0000000 ®00800® m Oo 0 0 00 oc o o `� g <br /> CALIFORNIA MARKET <br /> L E ~z ~z Ei ~z ~z rz fz o = g g ti g O <br /> O <br /> v c0 0 cv 00 v 8 8 �. z � z mr. SITE ADDRESS: <br /> K D O O O O QG O OV O $ o U U z Z N W W <br /> U m m INTERNAL ESO FACTORY WIRING <br /> o 0 0 0 0 0 0 0 0 0 0 0 0 i 0 D: 0 or 10 0 <br /> LOAD 120V FOR RS BOX <br /> 1 2 3 4 5 6 7 8 N OND FP WHICH IS ROUTED <br /> THROUGH EMERGENCY Oo0 <br /> aoocic�,�}i©o ooe!elel oia, ooaooeea �,e®©®®©® <br /> STOP RELAY FACTORY o <br /> 0WIRED 00000 00000 C1�0000 00000 00000 00000 00000 00000 00000 00000 00000 00000 <br /> w FACTORY W!RING <br /> H TO TERMINAL L Q <br /> !: ! BLOCK D1-2 FACTORY WIRING ® 00000 �ADDD 00000 00000 00000 00000 DOA ����� 00000 "la: <br /> � �®� O <br /> FACTORY FACTORY FACTORY TO TERMINAL " <br /> WIRING TO WIRING TO S s o o m e �3 s i s5 E, a a®�Ir DEWn Y SHK/0 DR <br /> WIRING TO BLOCK IG s B g 6 6 <br /> TERMINAL TERMINAL T FACTORY SH�JO DO0 <br /> BLOCK SWN BLOCK D1-1 BLOCK 1 WIRING TO a NAVIN aY: GRS/O ° DBTERMINAL var" <br /> w <br /> BLOCK GN � � � � � � � � INTERNAL ESO FACTORY WIRING : V_g-O PRo�ECTNa i <br /> NO-FES: '"' 0100 /2010 O <br /> DRAINING TITLE: _c <br /> 1. REFER TO DISPENSER INSTALLATION DIAGRAMS FOR TERMINATION LABELING. $ $ $ $ ESO AND RESET <br /> 2. ALL FIELD WIRING TERMINALS MUST BE WIRED WITH A MINIMUM INSULATION RATING OF 60•C. 13 B 2 8 ELECTRICAL PANEL POWER o <br /> � 2 � � � � � R � � � � � � � ara a a FIELD WIRING TO <br /> 3. WIRING IS TYPICAL OF ALL DISPENSERS. GROUND CONDUCTOR #12AWG MUST BE RUN FROM EACH DISPENSER TO THE GROUND BAR AND CONTROL DETAILS th <br /> N I M z z z z z CASHIER CONTROL Q, <br /> z z o_ z z z z a. z z o_ z z o. z z o_ z z o. z z n. <br /> Or THE DISPENSER/PUMP PANEL. oB o $ c B o 8 0 8 c B o 8 o B a <br /> 0. � 0. � IL � CL � a. 11. � � � � � � � � PANEL i <br /> {NS�RUGTIONS SHOULD OBE R�ALL)OA D. DATA(DC) ARE TYPICALLY RUN IN SEPERATE CONDUITS, HOWEVER, DISPENSER MANUFACTURERS WIRING LEGEND SHEET NO: <br /> 5. ALL VARIABLE FREQUENCY CONTROLLER WIRING MUST BE ROUTED SEPERATELY FROM ALL OTHER WIRING DUE TO ELECTRICAL NOISE 0.0. 0. a a 0. 0. a LFIELD WIRING TO J FACTORY WIRING <br /> CREATED BY THE CONTROLLERS. 2 2 2 2 2 2 2 2VEEDER ROOT PANEL <br /> FIELD WIRING TO DISPENSERSMFIELD w1R1Nc <br /> L <br /> 5332 0- <br /> D: ELECTRONIC DISPENSER POWER ISOLATION RELAYS SCHEMATIC DETAIL E : TYPICAL FUELING CENTER AT TERMINAL BLOCKS ' ' <br /> J <br /> NOT TO SCALE: NOT TO SCALE: °' <br />
The URL can be used to link to this page
Your browser does not support the video tag.