My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTW OF CPI POWER BOX CLIENT- <br /> ---------- <br /> LIENT:---------a-®® ----------------------------------------------------e---------------------------------------------------M�-----------------� <br /> i <br /> 1 f 1 OPERATOR ACTIVATES \:1 <br /> EMERGENCY FUEL EMERGENCY SHUTDOWN <br /> I 1 PUSHBUTTONS SUPPLIED <br /> WHEN E-STOP SWITCH �3A SHUTDOWN BUTTON <br /> IS HIT -- CONTACTS <br /> BY CPI PER PROJECT 1 <br /> ARE OPENED AND REQUIREMNETS 1 EMERC,p�CY4►;DOWN ���.;,;:.;.: . <br /> POWER AND NUETRAL ' 1 <br /> 10 DISPENSERS ARE <br /> REMOVED 1 IMPORTANT NOTE <br /> TYP ALL DISPENSERS 1 INPUT BOARD #1 INPUT BOARD #2 INPUT BOARD #3 INPUT BOARD #4 , I EMERGCY RESET <br /> ( ) EN <br /> 1 I PUS°r�GU ITON <br /> 1 TYPICAL FIELD WIRING TYPICAL 12 WIRE a e a E r a x 1 a c o E r a N N a c • E F • N N a c • e F • N i iMPORTANT NOTE JUMPER INSTALLED BY CPI 1 I LOCATED Ota REMOTE <br /> 1 MULTiCNDUCTOR , o � 0 ® To ® v ® 14 N= <br /> , ovvvvvvo , ovvvvvvv #14 AWG TO BE REMOVED IF DEVICE 1 CONRULPANEL <br /> MPD 1 POWER 1- -�Q PDI TO CONTACTOR i (POLE 1j ALL FACTORY CONTROL WIRING SHALL 1 <br /> 2 0 170 0 0 0 mm 0 0 2 0 H>D 0 0 0 0 0 1 0 p 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 IS CONNECTED GLOW . FUELS TECHNOLOGY <br /> s0 ® o ® avoo s00ovvvoQ sv06= 00000 s000000017 BE #16 AWG EXCEPT AS NOTED 1 150 WARRENVILLE ROAD <br /> MPD1 SWITCHED NEUTRAL 1-- Q ----� TO CONTACTOR ? POLE 2 ` o ® c° an ® v ® o ' v o v an v o v ® s v v Em o v v v o 4 v o v v o v v v TO PANEL G CKT 40 m ES1 0 ' ESO TErdl lli� 5IeCK <br /> ( ) 0 0 0 0 0 0 0 0 ® a L� o v v v o v v a 0 0 0 0 m= r:x a v v v v o v v v # EMERGENCY SHUTDOWN PUSHBUTTON _OCATED fiE �g <br /> 1 e o v v o ® v o ® e v v v v v o v v a v v v ® o v v v s v 0 0 E� 0 0 0 0 ON CPI EXTERIOR CABINET DOOR S�+ SiS R3R WITHIN CPI TAN€L NJRpIoR'61ILLE, ILLINOIS �50563-I3473 <br /> FROM UNLEADED —1-- Q Ot-1 - I -B?i<-- - 7 � ® v v ® ® ® v v v v v v o v ® F v o o v o v v v v o v v v v I� I� ES1 a �' ` 2'2 2Y2 SEE SHEET !x.`+.3,3` <br /> �„ s d 0 ® ® ® 0 0 v a v v v v o v v Em a ® v a cm v v o v • v o v v v v E3 v ENLARGED VIEW OF TO PANEL G NEUTRAL ES2 NATIONAL SITE ADAPT CONSULTANT: <br /> MPD 1 PREMIUM -1- Q Ot-2 L-RED - e o ® o v v v ® m a v v v v v v o v e 0 0 v o Em v v v • 0 0 0 0 0 0 0 0 DIP SWITCH SETTINGS T— _ �LIJ EMERGENCY SHUTDOWN PUSHBUTTON LOCATED <br /> 1 n�� -_- - 10 o ® ® v v o v I� ,a v o v v v v v v ,o o v v v I� v o v +o v o v v v v v v ES2 - �7 ON OPTIONAL CASHIER CONTROL PANEL <br /> 1 MPD #1 PD #2 MPD #3 MPD # MPD #5 MPD #6 PD #7 PD #8 MPD #9 PD #1 PD #1 PD #12 TO ISOLATED GROUND BAR L - I <br /> E_oES3 OPTIONAL FIELD INSTALLED REMOTE <br /> 1 ON OFF ON OFF ON OFF ON OFF - EMERGENCY SHUTDOWN PUSHBUTTON <br /> TO SUBMERSIBLE PUMP CONTACTORS <br /> t 1 0 0 0 0 v 0 HiJ 7 0ES3 <br /> lo <br /> MPD 2 POWER -1- Q Poe TO CONTACTOR 2 (POLE 1) TO CORRESPONDING <br /> MPD2 SWITCHED NEUTRAL -1- Q SWN - TO CONTACTOR 2 (POLE 2) m ER1 , EMERGENCY RESET PUSHBUTTON LOCATED ON TERMINALS LOCATED <br /> 1 P 0 ER1 CPI EXTERIOR CABINET DOOR IN CPI PETRO <br /> UNLEADED Q D2-1 TAN TERMINAL BLOCK <br /> FROM —r ELECTRONIC DISPENSER POWER ISOLATION RELAYS + SYSTEM <br /> WITHIN CPI PANEL. � � m ER2 -f- - EMERGENCY RESET PUSHBUTTON LOCATED ON <br /> MPD 2 S PREMIUM -- -1- Q D2-2 �U * REFER TO DIP SWITCH CHART FOR ACTUAL SETTINGS * SEE SHEET M.5.3.35 0 0 n A m ER2 - OPTIONAL CASHIER CONTROL PANEL <br /> l 1 GRY INM DP SW ITCM WPM DP SWITCHES INPUT DP SWRCHM INPUT DIP SWITCHES ES R E LAY ES E 1 <br /> 1 ,a------- <aoovaoob ,aoaovovo ,aa,sa.&aa,a � � � N c SEE SHEET M.5.3.35 m ER3 T — OPTIONAL FIELD INSTALLED REMOTE <br /> .v0000coo _ <br /> 1 '�vv�avoo :9-9----- OO FOR LOCATION IN PANEL a m ER3 — i— - EMERGENCY RESET PUSHBUTTON E-STOP/RESET CASHIER CONTROL Gettier - Ryan Inc. <br /> ° :avovovve °vovvvv 0 <br /> 0000000 'v FIELD WIRING TO <br /> O CASHIER CONTROL ' PANEL WIRING DETAIL 6747 SIERRA CT. SUITE J <br /> MPD 3 POWER -� —I— Q PD3 TO CONTACTOR 3 (POLE 1) Sovvvvvvv ?ovovv�av 1/4 Mr 00000000 oeooevo 00000000 0000 <br /> TYPICAL FACTORY WIRING <br /> :������: :���:z><= ����::�� ����:�z-� tm Ita Mn Tra Lm Irn Iran r7n R)SE PANEL FIELD WIRING �---- --------------------� DUBLIN, CA. 94568 <br /> MPD 3 SWITCHED NEUTRAL -� - Q SWN TO CONTACTOR 3 (POLE 2) ❑❑❑❑❑❑❑❑ ❑001=0❑❑ ❑❑❑❑❑❑❑❑ 00000000 a a a To tT t2 t3 - <br /> • • • • • • • • �'-— -J NOT TO SCALE: <br /> 1 Iran Lm Lm Ian Im Iran Im Im Iran Iran Lm m m Im rm Iran ren m m LLn LLn m Im Lm Lm Lm=MUD Iia rr n Iran -F—- ---- 5 OPERATOR ACTIVATES 1 (925) 551-7555 <br /> FROM UNLEADED --- —1— Q D3-1 OR 7 2 3 4 a e 7 a 1 2 3 4 a a 7 9 1 2 3 4 a a 7 8 1 2 3 4 a a 7 8 WHEN E-STOP IS HIT - 1 <br /> r • • • • • • • • • • • • • • • • • • • • • • • • • e • o • • • • EMERGENCY FUEL RESET <br /> MRD 3 j PREMIUM -- -H- Q D3-2 GR POWER TO SUBMERSIBLE BUTTON 1 <br /> 1� X00=❑❑0❑ ❑OO����� �������� ������❑0 ON 2 PUMP CONTACT COILS EMERGENCY <br /> 1 YEL • • • • • • • • OFF MASTER DRAWING RELEASE HISTORY <br /> ERHNHHHHAVID AND DISPENSER POWER SHUTDOWN <br /> 1 TTI TTI lTl TTI CONTACTOR COILS IS PUSHBUTTON <br /> LINE REMOVED LOCATED ON REMOTE VERSION DATE <br /> 1 BCDEFGHJ BCDEFGHJ BCDEFGHJ BCDEFGHJ 12345678 Ll OD 1 CONTROL PANEL <br /> MPD4 POWER -� Q PD4 TO CONTACTOR 4 (POLE 1) _ _ _ _ _ 1 COXX V-0 MAY 2000 I <br /> MPD 4 SWITCHED NEUTRAL -t-- Q Q?T O D D© 0 0 0 0©©D O m 1 <br /> Q SWN TO CONTACTOR 4 (POLE 2) f I T T <br /> FROM UNLEADED —; L R T L O G B P L R T L O G B P L R T B O G R P F � � � F ; COXX V-1 FEB ZOOI <br /> (' Q 04-1 BR`s L E A L R R R U L E A L R R R U L E A L R R R U ON ON ON ON ON ON <br /> MPD 4 { PREMIUM - -- K D N U G N N R K D N U G N N R K D N U G N N R <br /> ll COXX V-2 JUNE 2001 u <br /> 1 �Q_LD4--2 PU MPD-1 MPD-2 MPD-3 MPO-4 MPD-5 MPD-6 1 ESO TERMINAL BLOCK X <br /> 1 1 E E COXX V-3 JAN 2002 <br /> pN SS WITHIN CPI PANEL <br /> I 1 LOAD OFF OFF OFF OFF OFF 3 3 <br /> 1 1 2345678 Ngo <br /> ' SID= SHED M.5.3.3 COXX V-4 JUNE 2002 1n <br /> TT <br /> MPD 5 POWER -I- -�Q Po3 TO CONTACTOR 5 (POLE 1) 1717171717177777 O O© MPD 1 POWER MPD 2 POWER MPD 3 POWER MPD 4 POWER MPD 5 POWER MPD 6 POWER COXX V-5 FEB 2003 0 <br /> MPD 5 SWITCHED NEUTRAL -- - -I v SWN TO CONTACTOR 5 (POLE 2j CONT. 1 30 FLA CONT.Z_ 30 FLA CONT.3 30 FLA CONT.4 30 FLA CONT.5 30 FLA CONT.6 30 FLA I COXX V-6 JULY 2004 <br /> FROM UNLEADED -� - -�-- —( :� 1 -BLK W G Y P W G Y P W G Y P N N N N N NI _ <br /> T p p p <br /> `�--' COXX V-7 MARCH 2006 <br /> MPD 5 PREMIUM -- —!-- -- H R E N H R E N H R E N TO CORRESPONDING <br /> �Q jLr; 2 —REI}---- T Y L K T Y L K T Y L K 1 COXX V-$ JULY 2007 <br /> TERMINALS LOCATED <br /> ! 3 SWN 2 SWN 7 SWN 6 SWN 1 SWN 10 SWN ; IN CPI PETRO II <br /> t 1 t I 1 + ISYSTEM <br /> COXX V-$.1 DEC 2008 <br /> / G I 1 COXX V-9.0 JAN 2010 <br /> MPD 6 POWER -F- �Q-�-Pm - TO CONTACTOR 6 (POLE 1) 1 <br /> MPD 6 SWITCHED NEUTRAL -1— 0 Sm - TO CONTACTOR 6 (POLE 2) I REMOTE EMERGENCY STOP WIRING U) <br /> N0. DATE REVISION DESCRIPTION <br /> FROM UNLEADED —�- Q DS 1 TAN-- TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL <br /> MPD 6 PREMIUM -�-- -1- Q D -2 BL BLOCKS BLOCKS BLOCKS BLOCKS BLOCKS BLOCKS " 1 DETAIL <br /> 1 <br /> ' WHEN E-STOP SWITCH IS 3A 'PDS & "SWN" "PD6' & "SWN 1 NOT TO SCALE: _ <br /> 1 HIT - CONTACTS ARE 2 •d- <br /> ED AND POWER AND <br /> �- YEL NUENETRAL TO DISPENSERS oN ON ON GN ON ON 3 <br /> 1 ARE REMOVED F � ' O <br /> MRD 7 POWER ----- -I- Q PD7 11- - TO CONTACTOR 7 (POLE 1) MPD-7 MPD-8 MPD-9 MPD-10 MPD-11 MPD-12 1 <br /> _ (TYP. ALL DISPENSERS) 1 4 I O <br /> MPD 7 SWITCHED NEUTRAL -; Q sw'N - - TO CONTACTOR 7 (POLE 2) <br /> - F � � 0 OFF 1 5 N <br /> FROM UNLEADED - -r- d,D7-1 ORa 1 <br /> MPD 7 PREMIUM - -F- Q 07-2 -GRN-- - I 6 O <br /> 1 MPD 7 POWER MPD 8 POWER MPD 9 POWER MPD 10 POWER MPD 11 POWER MPD 12 POWER 1 <br /> I 1 CONT.7 30 FLA CONT.$_ 30 FLA CONT.9 30 FLA CONT. 10 30 FLA CONT. " 30 FLA CONT.12- 30 FLA ; 7 <br /> 1 _ <br /> 1 PNK N N N N N Ni 8 <br /> MPD 8 POWER —1-- Q PDO TO CONTACTOR 8 (POLE 1) 1 ami <br /> MPD 8 SWITCHED NEUTRAL SWN TO CONTACTOR 8 (POLE 2) 15 SWN 1a SWN 1s SWN 15 SWN 3 SWN 22 SWN ' 9 ° <br /> FROM r UNLEADED �— —r Q DB-1 BR t t t t t 1 i I t ' VEEDER-ROOT LINE LEAK <br /> f MPD 8 j PREMIUM -�- -1- Q D8-2 PU - - - - - - <br /> ll 1 DETECTION SYSTEM SUPPLIED 11 <br /> ' I AND INSTALLED BY OTHERS 2 <br /> TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL TO TERMINAL 1 SEAL <br /> MPD 9 POWER --- - i- Q PDO TO CONTACTOR 9 (POLE 1) BLOCKS BLOCKS BLOCKS BLOCKS BLOCKS BLOCKS 1 <br /> "PD7" & "SWN" "PD8" & "SWN" "PD9" & "SWN" "PD1 0" & "SWN' 'PD11' & "SWN' 'PD12" & "SWN' 1 s <br /> MPDS SWITCHED NEUTRAL --- - J- Q SWN TO CONTACTOR 9 (POLE 2) <br /> I ---------------------- cn <br /> FROM UNLEADED - r Q D9-1 BlK 4 e c <br /> POWER MAY OR MAY NOT BE PRESENT WHEN E-STOP 1 SSD A h' <br /> MPD 9 PREMIUM -�- - f- Q D9-2 RED <br /> SWITCH IS HIT DEPENDING ON WHERE SUPPLY <br /> 1 _yWH CIRCUIT WAS FIELD WIRED FROM. THIS DOES NOT 1 �� 9/: o <br /> ' N L VEEDER ROOT PANEL INTRINSICALLY SAFE BAY �"� ,4�Y ' ° <br /> I AFFECT POWER TO THE SUBMERSIBLE PUMP AS THIS 1 A 0 <br /> 1 IS ONLY A HOOK SWITCH POWER TO VFC I C 1 LJ3 <br /> s <br /> 1 _ ------------ --------------------- ------------------- -------------------------------- - ---�----� POWER BAY E 11 ,k cn <br /> MPD 10 POWER --�- — L Q Po10i TO CONTACTOR 10 (POLE 1) <br /> I. MPD10 SWTTCkIEo NEUTRAL F— — - Q SWN TO CONTACTOR 10 (POLE 2) i I r------------------- --------------------------- ------------------------ - T - I ��1 N <br /> FROM UNLEADED - — t- Q 10- --TANI I r----------------- - -- I I -, I C` Oe• <br /> MPD 10 { PREMIUM -�-- — 1-- Q 1O- BL I I I 1 I I I I F <br /> 1 I * IMPORTANT NOTE * I I r--------------- -------- ----------------------- 1-- I I CAS•-F E <br /> ------------------------ — <br /> 1 GR I REMOVE JUMPER WHENEVER A 1 I r - *- 1 1 1 <br /> t I LINE LEAK DETECTOR SYSTEM I 1 ------------------------ - _j- I I I I 1 1 2 3 4 THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT I <br /> YET- I I I COPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO. <br /> 1 I IS USED. INTERCONNECT I I I I --- ------------------------ - - - I 1 THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL <br /> MPD 11 POWER -14-- PD1 i I PUMP CONTROL WIRING I I I 1 III I 1 + + + + PROBE BUSINESS INFORMATION OF BP. ACCORDINGLY,THE M <br /> TO CONTACTOR 11 (POLE 1 I I I I _____ _ -�-, I I I I I <br /> I THROUGH THE LLD SYSTEM AS I L� RECIPIENT AGREES TO RETAIN THESE MATERIALS IN STRICT <br /> MPD 11 SWITCHED NEUTRAL --I— Q SWss TO CONTACTOR 11 (POLE 2 I I SHOWN. 1 I I I I I r I I I I 0 ® ® 0 ® ® ® 0 CONFIDENCE AND AGREES NOT TO DISCLOSE THESE Ih <br /> 1 I I I MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES <br /> 1 n I I 1 (TYPICAL OF ALL PUMP I I I I I I I r__-- I I I 1 2 3 4 5 1 2 3 4 NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT <br /> FROM DIESEL -I-- - ? t 1-1!v,T-----OR CONTACTORS T 1 I III I I AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> MPD 1 1 1 1 I I III 1 i I i I NC NO C NC NO C NC NO C NC NO C NC NO C NC NO C NC NO C NC NO C NC NO C PURPOAVAILASE <br /> F AND ICH SP HAS MADE THE <br /> NT AGREES TO RETURN ALL <br /> I1 I I I I e ® 0 ® e PRtSSURE XMIT MATERIALS TO BP ETHER UPON COMPLETION OF THE C <br /> 1 I I I I I 1 1 I I I 0 r e Q e 0 I ® T T e I e e e ® ® e ® ® ® e ® ® INTENDED PURPOSE OR UPON THE REQUEST OF�. <br /> 1 pNK--_ TERMINAL BLOCK TERMINAL BLOCK TERMINAL BLOCK TERMINAL BLOCK I 1 I 1 -- J II I I I 1 2 3 4 5 6 WHICHEVER COMES FIRST. sll <br /> I— t to WITHIN CPI PANEL 2 zA 3 3A WITHIN CPI PANEL. + 4A WITHIN CPI PANEL. 5 5A WITHIN CPI PANEL' I I III 1 I I - -- h J I I I + + + + + + PIPE AND TANK bESIGN DISCLAIMER: v <br /> MPD i 2 POWER -I— PO12 TO CONTACTOR 12 (POLE 1 j SEE SHEET M.5.3.35LT 0 TERMINAL BLOCK SEE SHEET M.5.3.35 SEE SHEET M.5.3.35 SEE SHEET M.5.3.3� I I I I--- --_ _- -J 1 SP DOES NOT AND CANNOT WARRANT'HAT THE PLANS FOR <br /> --------- I AL LEGAL REQUIREMENTS THAT EMIST OR AS THEY MAY BE m <br /> MPD 12 SWITCHED NEUTRAL --•-- S1$.'3 I --�-- 10 CONTACTOR 12 (POLE 2) N WITHIN CPI PANEL 00 e e 00 1 I I I 1 ( I 1 1 -�--�-J I I I ® ® � �j ® � ® ® 9 ® ® 9 PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT NATH (n <br /> FROM ' - v SEE SHEET M.5.3.35 1 I I III L---- __-JAL--�---_.1,_-- -J 1 M UNE LEAK WGIRRE APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A c_ <br /> DIESEL �-�--- 12- BR?+ -" - e LT1 I I I I 1 -J I I I I FUE.iNG STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN <br /> CONFORMITY MTH THESE PLANS WILL BE FREE:OF AL $ <br /> MPD 12 1 I III ———— ————————� I I I 1 2 3 4 LEAKS YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO a <br /> I _- I <br /> SENSOR CONSULT WITH A FUELING STATION ENGINEER OF YOUR <br /> 1 TYPICAL FIELD WIRING 1 I I III ---------------J I NC NO C NC NO C NC NO CNC NO C `p CH009NG TO INDEPENDENTLY EVALUATE WHETHER THESE <br /> 1 1 1 I 11 1 11 - - 1 i 1 I �c I I - PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> 1 1 1 1 1 I + 1 +2 +`� ? —1 $ 4. <br /> + +7 STORAGE AND DELIVERY SYSTEM AT YOUR STATION. <br /> 1 1 I I I I I I --------------J 0 0 0 0 0 ® AAA 8 0 0, I <br /> 1 1 I I I I I I I I PI — PUMP INPUT SIGNAL DEVELOPMENT INFORMATION. c, <br /> I I PR — PUMP RETURN (NEUTRAL) I ® O, 1 10: 01 0 0 161 G 0 u <br /> 1 I I III I I I I I L1 — LINE POWER INPUT UNDERGROUND STORAGE ° <br /> 4 1 CONT.Pl 30 FLA CONT.22_ 30 FLA CONT.� 30 FLA CONT.P4 30 FLA CONT.p_ 30 FIA 1 I I III I I I I 1 EIv150R 11 <br /> 1 I III PO — PUMP OUTPUT CONTROL I — I TANK STANDARDS <br /> ----------------®------------� SIGNAL SIGNAL SIGNAL SIGNAL SIGNAL 1 I I III 1 1 1 1 1 i 2 , 3 1 c I O f} i I 5 <br /> E 8 N N N N N (� I I III I I I I I PREM. UNL. PREM. UNL. DIESEL + + + + +— + + + ELEMENT TPO1 V) <br /> @` 1 19 21 VFC 23 25 VFC 27 29 VFC 31 33 VFC 3"5 37 VFC 1 I 1 I 1 I 1 1 1 I ( 1 2 3 4 5 ® ® 0 ® ® ® QI 0 ® ® 0 0 0 0 M'9.0 2010 SERIES <br /> ' ' I I I 1 I I I I I I PI PR L1 PO PI PR L1 PO PI PR L1 PO PI PR L1 PO PI PR L1 PO N <br /> I ' l t <br /> #1 l l �_ #2 1 �_ #3 1 #4 1 l 1 #5 1 I I I <br /> ! 1 _ 1 I i I I I i i i i i � 4� 1 4 � CALIFORNIA MARKET <br /> E 1 1 1 1 III I I I I I I 1 1 I I I I 1 I I I 1 I I I I I I I In <br /> O <br /> TO CORRESPONDINGF 1 I 1 1 1 I I �� ADDRESS' O <br /> TERMINAL PETRO 1 1 I I I I I I I �h--�-� - -- , O <br /> IN CPISYSTEM — <br /> 1 I I I I I I I I I I I I I I I j j j j I L__ _ —'ti's'—�`—J 1 I I I I I <br /> 1 I I I I I I I I I I I I I I I I I I III L---- J I I I 11 1 j I I I I <br /> f f f f f f 1 I I I I I I I I I I I I I I I O <br /> I I I 111 1 1 I I 1 1 I 1 1 1 1 1 I I I <br /> 1 00 <br /> FIELD WIRING TO FIELD WIRING TO FIELD WIRING TO FIELD WIRING TO FIELD WIRING TO 1 1 1 I I I I I 1 I 1 I I 1 I I I I 1 I I <br /> PREMIUM PUMP 1 UNLEADED PUMP 1 PREMIUM PUMP 2 UNLEADED PUMP 2 DIESEL PUMP 1 I I I I I I I I I 1 1 1 I I I W <br /> 00010100 MOTOR MOTOR MOTOR MOTOR MOTOR 1 1 1 I (fi ------J <br /> TERMINAL BLOCK TO ES RELAY ------- L-- I I 1 I I I I 1 I I I Ld <br /> 1A 2A 3A 4A 5A N WITHIN CPI PANEL. 1 TERMINAL #4 1 I I L--------��-�h----- �-�h---J I I I I I I I I DESIGNED BY: SHKQ ALLIANCE Z&W. DB <br /> SEE SHEET M.5.3.35 --------- <br /> 0001000 1 3B WHEN E—STOP IS HIT — 1 1 JII I �I � I I I SHK(0 DB O <br /> CHECKED 8V BP REPM: <br /> 1 PUMP CONTACTS COILS EXTENT OF CPI POWER BOX 1 L Jti--------- �----- ------�-�-----ren----' I I J <br /> 1 ARE OPENED 1 I 1 1 I I I 1 I I I DRANK BY: GRS/0 AWANGE Pm' DB w <br /> L------------------------------------ ------------------------------� 1 1 1 1 1 1 1 1 I I VERSION; PRO,ECT N0 <br /> _ _ ___ _TO TERMINAL BLOCK ���•® 00 <br /> - I -- - I ---- I - I IGN ON CPI 01/04/2010 C <br /> E!!: <br /> P2 P3 P4 P5 NOTES: l --- I I ---=a 1 ————L ------— TO TERMINAL SYSTEM K 0 <br /> 1. REFER TO DISPENSER INSTALLATION DIAGRAMS FOR TERMINATION LABELING. L------4------�- - -- �------_ <br /> FP ON CPI SYSTEM DRAWING TITLE: <br /> 2. ALL FIELD WIRING TERMINALS MUST BE WIRED WITH A MINIMUM INSULATION FIELD WIRING TO J <br /> RATING OF 60'C. VEEDER-ROOT LINE LEAK <br /> �LE 1� � C--� DETECTION SYSTEM. EMERGENCY SIiUTDOWN SCHEMATIC <br /> UNLEADED 9 PREMIUM #1 UNLF�ED #2 PRE1401UM #2 DIESEL 3. WIRING IS TYPICAL OF ALL DISPENSERS. GROUND CONDUCTOR #92AWG MUST U <br /> BE RUN FROM EACH DISPENSER TO THE GROUND BAR OF THE DISPENSER/PUMP FUELING CONTROLS W/VFCIS <br /> f PANEL. <br /> I 4. DISPENSER PUMP POWER(AC) AND DATA(DC)MA ARE TYPICALLY RUN IN WIRING LEGEND m <br /> SEPERATE CONDUITS, HOWEVER, DISPENSER MANUFACTURER'S INSTRUCTIONS <br /> SHOULD BE FOLLOWED. SHEET NO; c <br /> SUBMERSIBLE PUMP PILOT LIGHTS ARE LOCATED v <br /> ENCLOSURE FALL R ALL OT LE FREQUENCY CONTROLLER WIRING MUST BE ROUTED SEPERATELY FUEL SYSTEM WIRING D AGRAM W/ EMERGENCY SHUTDOWN FACTORY WIRING <br /> ON FRONT OF CABINET ENCLOSURE DOOR <br /> --- FROM ALL OTHER WIRING DUE TO ELECTRICAL NOISE CREATED BY THE <br /> 6. ALL WIRNG FOR THE EMERGENCY STOP FUNCTION OF THE FUEL SYSTEM IS NOT TO SCALE: <br /> FACTORY PREWIRED INTO THE CPI PETRO PANEL THE ONLY FIELD WIRING TO ---------------------- FIELD WIRING p <br /> 4 <br /> TTHE HE REMOTE EMERGENCY STOP SWITCHES IS REQUIRED TO BE INSTALLED BY <br /> ® m3,3 <br /> �1 <br /> ` SUBMERSIBLE PUMP STATUS PILOT LIGHT WIRING DETAIL <br /> E 7. FACTORY TERMINAL BLOCKS SHOWN ON THIS DRAWING ARE SHOWN <br /> I NOT TO SCALE: II SCHEMATICALLY FOR CLARITY. ALL TERMINAL BLOCKS ARE LOCATED AT THE J <br /> 1 BOTTOM OF THE CPI PETRO PANEL. SEE SHEET M.5.1.45 FOR LOCATION <br /> E LLQ <br />
The URL can be used to link to this page
Your browser does not support the video tag.