Laserfiche WebLink
9255517899 Line 1 01' 36 a.m. 04-01-2011 417 <br /> ®GET TUR-RYAN INC. GR Job # 10-058090 <br /> F. In-Tank Gauging 1 SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform teak detection monitoring. <br /> Complete the following checklist: <br /> I& Yes ❑ o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* Was accuracy of system products level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes [] No* Were all probes reinstalled properly? <br /> Yes ❑ No' lWere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ o For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(check all <br /> ❑ N/A that apply) Simulated leak rate: l@ 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> E Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [I Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For Mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> NIA <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> E Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> © NIA Disconnected? <br /> Yes (] No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ NIA fails a test? <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> [] N/A <br /> �y Yes [] No' were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 <br />