My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:32:06 PM
Creation date
5/12/2020 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US ,SYSTEM PRINTSET INFORMATION <br /> 1.. 1/ Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. J7 Plans drawn to scale in non-erasable print. <br /> 3. / Plot plan to show location and number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Detail of tank, piping system, excavation and cover. <br /> 6. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> 7 Article 3, Sec. 2631 (r) & 26351 <br /> 7. Verification of product compatibility with the tank(s), piping, monitoring <br /> / device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> g. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. 7 Tightness Test (NFPA 30) is required on both primary (1 0) and secondary (20) containment systems before covering. <br /> / [Section 2635 (b) (6) & (7)] <br /> 10. ✓ Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br /> 11. �_ NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION �� � <br /> TANK # # # # # # <br /> CAPACITY <br /> MANUFACTURER <br /> COMPOSITION <br /> MODEL <br /> PRODUCT <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> \\ A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.