Laserfiche WebLink
L <br /> L4.0 BACKFILLING SOIL BORINGS <br /> Soil borings will be backfilled with a cement/sand grout or cement/bentonite grout. The grout <br /> will be placed in one continuous pour before its initial set from the bottom of the boring to <br /> ground surface. The grout will be emplaced by free fall through the open borehole. <br /> C <br /> L <br /> L <br /> L <br /> L <br /> L <br /> B — 3 DA918IMPROTOCOLMM <br /> BOYAJIAN & ROSS, INC. <br /> Environmental Scientists & Engineers <br />