My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
WORK PLANS_CASE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:21:45 PM
Creation date
5/12/2020 3:14:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 3
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> A. Date and time sampled. <br /> B. Sample number. <br /> C. Analyses required. <br /> D. Remarks, including any preservatives and special conditions. <br /> E. Container number in which sample has been packaged. <br /> Blank spaces on the chain-of-custody:record will be crossed out between last sample number <br /> listed and signatures at the bottom of the sheet. <br /> After carefully packaging the samples.into ice-cooled chests for transfer to the laboratory, the <br /> field sampler will sign the chain-of-custody record and will record the time and the date. The <br /> original imprint of the chain-of-custody record will accompany the sample containers. A <br /> duplicate copy shall be placed in the B&R project file. . <br /> 6.0 EQUIPMENT CLEANING <br /> The sampler, liners, spatula, and any tools used in the assembly and disassembly of the sampler <br /> will be thoroughly cleaned before and after use on each boring. Before cleaning, all soil will <br /> be removed from the tools and.parts using a stiff-bristled brush. <br /> i <br /> k <br /> C — 3 DA98117WROTOCOL.W'M <br /> BOYAJIAN & ROSS, INC. <br /> Environmental Scientists & Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.