Laserfiche WebLink
I-ftw N.04 <br /> LO <br /> Le Replicate Samples <br /> Sets of water samples will be collected in identical containers from the same water source and <br /> L- will be given different sample identification numbers. These numbers will be recorded on the <br /> sample control log sheets and water quality sampling record. One set of the samples, termed <br /> the "primary" sample, will be submitted to the primary subcontracted laboratory. The additional <br /> sets of samples, termed the replicate samples, will be submitted to the primary laboratory and/or <br /> to a secondary laboratory for identical analyses or an alternative analytical procedure as specified <br /> by the project manager. <br /> Blank Samples <br /> La Blank samples will consist of field blanks or travel blanks. A field blank is deionized water that <br /> is added to the sample bottles at the time of sample collection. A travel blank is deionized water <br /> that is added to the sample bottle by the subcontracted laboratory and which accompanies the <br /> other sample containers throughout the trip from the laboratory to the field and back to the <br /> laboratory. The field blank sample bottles are preserved and labeled in the same manner as the <br /> groundwater samples and are stored with the groundwater samples. Travel blanks are prepared <br /> by the subcontracted laboratory and are preserved in the same manner as groundwater samples, <br /> but are identified as travel blanks on the sample label. Travel blank samples will be designated <br /> as such on the chain-of-custody record. <br /> L„ 3.5 HANDLING, STORAGE, AND TRANSPORTATION <br /> Efforts will be made to handle, store, and transport supplies and samples safely. Exposure to <br /> dust, direct sunlight, high temperature, adverse weather conditions, or possible contamination <br /> will be avoided. Samples will be placed in an ice-cooled chest immediately following collection <br /> and will be delivered by Boyajian & Ross, Inc. (B&R) to the subcontracted laboratory as soon <br /> A" as possible, with a maximum holding time of 14 days. <br /> t. 4.0 FIELD MEASUREMENTS <br /> Field measurements of temperature, pH, and specific electrical conductance will be performed <br /> on groundwater samples. Data obtained from field water quality measurements will be recorded <br /> on the water quality sampling record. Field measurements will be made on separate aliquots of <br /> groundwater, which will not be submitted for laboratory analysis. <br /> 4.1 TEMPERATURE MEASUREMENT <br /> Temperature measurements may be made with a mercury-filled thermometer, or with an <br /> L& electronic thermometer, which is part of a combination field meter. <br /> D - 3 DA98IMPROTOCOL.W N <br /> i.r <br /> ]E;kBOYAJIAN & ROSS, INC. <br /> Environmenlal Scientists & Engineers <br /> Le <br />