Laserfiche WebLink
F � � <br /> V <br /> 13.0 HEALTH AND SAFETY BRIEFING FORM <br /> Project No. 98117 Project Name: Port of Stockton <br /> Project Manager: Philip Ross Project Safety Officer: Philip Ross <br /> Site Safety Officer: Calvin Erdman (or designee) Date of H&S Plan: June 30, 1998 <br /> Copy of Plan On-Site? Yes No <br /> Required Level of Protection: As required by task being performed i <br /> u <br /> Air Sampling Equipment/Methods: PID if required by the task being performed. <br /> Respirator Cartridges: Organic vapor if respirator use is required based on PID measurements. <br /> Read H & S Has H & S Staff Members <br /> Staff in Attendance Plan Equipment Initials <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> Yes No Yes No <br /> t <br /> E - 17 DA981171H&SPLAN.WPN <br />