Laserfiche WebLink
CHRONOLOGY <br /> Muller and Vail Tile Company <br /> 1119 Roosevelt St <br /> Stockton CA 95201 <br /> 6124188 500 gallon regular gasoline UST removed. Prop 65 #88-0114 and <br /> UAR filed today <br /> 7/181 Received lab results of 10 foot depth sample B 2 ppm, T 2 ppm, X <br /> 18 ppm, TPH 49 ppm EDB .2 ppm, Pb 9.9 ppm <br /> 7/20/88 UST delivered to Schnitzer steel in Rancho Cordova <br /> 9110196 Site put into LOP for additional evaluation <br /> 11/13/96 Implementation of preliminary assessment workplan. Drilled to 40 <br /> feet soil sample only. <br /> 3131197 Received and reviewed results. 15 foot TPH 16 ppm, 30 foot T <br /> .006 ppm, E .005 ppm, X .2 ppm, TPH 1.6 ppm. 40 foot MTBE <br /> .029 ppm <br /> 411197 Began processing closure. <br /> I <br /> i <br /> I <br />