My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROYAL OAKS
>
0
>
3500 - Local Oversight Program
>
PR0545667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:46:38 PM
Creation date
5/12/2020 4:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545667
PE
3528
FACILITY_ID
FA0003947
FACILITY_NAME
COS ROYAL OAKS STORM PUMP
STREET_NUMBER
0
STREET_NAME
ROYAL OAKS
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
07228027
CURRENT_STATUS
02
SITE_LOCATION
ROYAL OAKS DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATCAssociates srrE SAFETY PLAN j <br /> I <br /> KEY SAFETY PERSONNEL AND RESPONSIBILITIES <br /> All personnel working for ATC at the job site are responsible for project safety. The operational and health <br /> and safety responsibilities of pertinent ATC personnel are identified below. <br /> PROJECT MANAGER: Jeanne Homsey <br /> The Project Manager is responsible for the provisions and submittal of this SSP to the Site Safety Officer <br /> (SSO) and for advising the SSO on health and safety matters. He has the authority to provide for the <br /> auditing of compliance with the provisions of this SSP,suspend or modify work practices, and to recommend <br /> disciplinary action for individuals whose conduct does not meet the provisions presented in this SSP. The <br /> Project Manager is also responsible for ensuring that Medical Surveillance Exams and Training Programs <br /> are current for all personnel working on-site. The Project Manager reports to the Corporate Safety <br /> Manager. t <br /> SITE SAFETY OFFICER: Tom Lutterman <br /> The SSO is responsible for the dissemination,of the information contained in this SSP to all ATC personnel <br /> working at the job site,and to the responsible representative(s) of each subcontractor firm working for ATC <br /> at the job site. The SSO is responsible for ensuring the following items are adequately addressed: Safety <br /> Supplies and Equipment Inventory; Accident/Incident Reporting Procedures; } <br /> Decontamination/Contamination Reduction Procedures; General Safe Work Practices. <br /> The SSO has the authority to suspend work anytime she/he determines the safety provisions set-forth in this <br /> SSP are inadequate to ensure worker safety. 'The SSO shall also inform the Project Manager of individuals <br /> whose conduct does not meet the safety provisions of this SSP. The Site Safety Officer reports to-the Project f <br /> Manager. A SSO or the alternate must be present during the field work operations. <br /> i <br /> I <br /> PAGE 14 <br /> I <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.