My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROYAL OAKS
>
0
>
3500 - Local Oversight Program
>
PR0545667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:46:38 PM
Creation date
5/12/2020 4:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545667
PE
3528
FACILITY_ID
FA0003947
FACILITY_NAME
COS ROYAL OAKS STORM PUMP
STREET_NUMBER
0
STREET_NAME
ROYAL OAKS
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
07228027
CURRENT_STATUS
02
SITE_LOCATION
ROYAL OAKS DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> i <br /> All equipment will be checked daily and replaced as necessary. Instrument manuals and an ! <br /> instrument log book will accompany equipment into the field. Any calibration, repairs or related <br /> information will be recorded in the log book. <br /> 8.0 LABORATORY QA/QC PLAN <br /> Soil and groundwater samples will be submitted to a State Certified Hazardous Waste Laboratory <br /> for chemical analysis of hazardous constituents. Established QA/QC procedures for analytical <br /> operations will include sample custody procedures, standards of:analytical accuracy, analysis of <br /> matrix spikes and method blanks, data reduction, verification of raw analytical data, and <br /> maintenance of control charts to monitor analytical performance. These QA/QC procedures are <br /> outlined in the laboratory QA/QC Plan which is available upon request. Organic chemical analyses <br /> will be performed in conformance with standard procedures established by the United States <br /> Environmental Protection Agency (EPA) in "Guidelines Establishing Test.En2ppdures for the <br /> Analysis of Pollutants Under the Clean Water Act" (40 CFR, Part 136, October 1984). The <br /> laboratory is periodically evaluated through external performance audits conducted by EPA and <br /> DHS using QC labs. The specific analytical methods to be utilized for purgeable and semivolatile <br /> 'I <br /> hydrocarbons analyses are shown on Table 2. <br /> Provided the database is of sufficient size, statistical techniques may be employed for data <br /> validation. <br /> 9.0 GROUNDWATER MONITORING PROTOCOL <br /> Monitoring of depth to water and free product thickness within wells at the site will be conducted <br /> using an Interface Probe or Conductivity Meter. For consistency, all measurements will be taken <br /> W:\Admin\Shclls\QAQC-98.DOC <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.