ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br /> Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner: <br /> ......... .... <br /> v-6 <br /> 4 <br /> A. A., <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br /> HQLE Ali© <br /> M An <br /> ;.AN <br /> ....... ..... <br /> X. <br /> -Ex- <br /> :0 <br /> U <br /> Afte j.4 0.0. <br /> ............. <br /> Xami ...... <br /> xx <br /> ... .. .... <br /> x <br /> x <br /> X1-X <br /> 7.25 2.14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0.37 2 2.55 0.34 <br /> 10.25 4.29 0.57 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 4 5.30 0.71 <br /> Annular volumes YOU be multiplied by 30%to account for porosity of fitter pack. <br /> If the aquifer is Slow to recharge, development will continue until recharge is too slow to practically <br /> continue. The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55-gallon waste drums unless permission is <br /> granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> WAAdmin\ShcJls\QAQC-98.D0C <br /> 9 <br />